Laserfiche WebLink
MONITUVANG SYSTEM CERTIF ;ATION <br />CERTIFICATION /TEST DATE: February 10 , 2010 <br />Al. FACILITY <br />Yes <br />A2. OWNER <br />No* <br />Name <br />7 -Eleven Market #2368 /Store #19976 <br />Yes <br />Name <br />7 -Eleven, Inc <br />Address <br />1399 N. Main Street, Manteca, CA 95336 <br />Yes <br />Address <br />P.O. Box 711, Dallas, TX 75221 <br />Phone# <br />209-239-3252 <br />Yes <br />Phone# <br />805-523-2949 <br />Contact <br />Jay Stemley <br />Yes <br />Contact <br />Jay Stemley <br />F. IN -TANK GAUGING / SIR EQUIPMENT: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and terminal <br />❑ <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No- <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance ch <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑; Check this box if LLDs are not installed. <br />Complete the following checklist: <br />■ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br />■ Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />❑ No* <br />■ N/A <br />❑ Yes <br />■ No* <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />0 No* <br />❑ N/A <br />❑ Yes <br />■ No* <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions <br />or fails a test? <br />❑ Yes <br />■ No* <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />■ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. COMMENTS <br />The 87 MLLD was tested on inspector request. <br />The 87 MLLD was replaced. <br />Page 3 of 3 <br />