My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 3:37:10 PM
Creation date
8/5/2019 11:56:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2014
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apply a bead of Blue Bond 801 around the housing threads <br />and thread the repair boot onto the housing. <br />STEP 8 <br />STEP 9 <br />STEP 10 <br />STEP 11 <br />STEP 12 <br />Index the repair boot with the fill tube at the 12:00 position. <br />Install the split insert around the pipe and apply a liberal <br />bead of Blue Seal Glue along the seam and lightly hold or <br />clamp until cured. <br />Install the insert into the repair boot. <br />Install the rear clamp and tighten to 65 inch lbs. (Be careful <br />not to do this until the Blue Bond 801 is cured.) Install the <br />outer clamp loosely so that air can escape between the insert <br />and the boot while the boot is being filled with Bostik sealant. <br />Fill the entire boot cavity with Bostik 1I00FS sealant. As the <br />boot fills it will begin to pressurize and push the insert <br />outward. <br />Tighten the outer clamp to 65 inch lbs. Clean up any excess <br />sealant and allow 24-48 hours for Bostik 110OFS sealant to <br />fully cure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.