My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 3:37:10 PM
Creation date
8/5/2019 11:56:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2014
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P VV Attestation No. P 4530 <br />• nw�„)�..«r. Kevin Graf <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance or nozzles. vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the nerd to staidly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles vapor recovery systems and EVR PHASE I Systems. All nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONLY to tested named individual. <br />P vv Attestation No. P 4500 <br />c ;% MiYE1F j c°IMw,xr <br />Gerardo Gunman Jr. <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion ofthis training course does not create a warranty or guaranty by OPW or your Installation <br />ane/or mainlmance olnozzles, vapor recoverysyStems and EVR PHASE I systems This training <br />course does not eliminate the need to strrctly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles vapor recovery systems and aR PH 1 Systems. A//nozzles <br />vaA7r recovery systems and EVR PHASE I Systems must be installed and maintained /n accordance with <br />manufacturer instructions and procedures. Attestation appiies ONL Y to tested named individual. <br />O P 1%"_ Attestation No. P 4534 <br />`� ° '�"""°" Jimmy Hamblen <br />VR -102- Walton Engineering Inc <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion ofthis training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer mstnutions and procedures when <br />installing and maintaining nozzles; vapor recovery systems and EVR PHASE I Systems. All nozzle; <br />va/br recovery systems and EVR PHASE Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONLY to tested named individual <br />O P Attestation No. P 4501 <br />Rex Hernandez <br />VR -102- Walton Engineering Inc. <br />.attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by oPW or your installation <br />and/or maintenance o/nozzles, vapor recovery systems and EVR PHASE I systems This training <br />course dors not eliminate the need to strictly adhere to manufacturer instnrtions and procedures when <br />installing and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. All nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and Procedures Attestation applies om Y to tested named individual <br />O P VV Attestation No. P 4524 <br />Michael Holkko <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion ofthis training course does not create a warranty or guaranty by OPW o/ your instal/ation <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer instrMlAms and Procedures when <br />installing and maintaining nozzles vapor recovrry systems and EVR PHASE I Systems. All nozzles, <br />vapor recovery systems and EVR PHASEI Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation apoires ONL Y to tested named individual. <br />O P Attestation No. P 4496 <br />James W. Hutchins <br />VR -102- Walton Engineering Inc. <br />.Attended Installation Training for EVR Phase 1 by OPNV, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Corrip/eno"ofinns training course does not create a warranty or guaranty by OPW o/ your insla/lation <br />and/or maintenance c�nozztes; vapor recovery systems and EVR PHASE I systems. This !raining <br />course does not eliminate the need to strncdy adhere fo manufacturer instructions and procedures when <br />installing and maintaining mules, vapo- recovery systems and fVR PHASEI systems All nozzles <br />vapor recovery systems and EVR PHASEI Systems must be instal/ed arid maintained in accordance with <br />manufacturer instmctions and procedures. Attestation applies ONL Y to tested named individual <br />O P w Attestation NO. P 4515 <br />Jaime Jauregini <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW o/ your instal/anon <br />and/or maintenance o( nozzle <br />vapor recovery systems and EVR PHASE I systems This trainin <br />course does not eliminate the need to strict/y adhere to manufacturer ing <br />structions and procedures when <br />Installing and maintaining nozzles, vapor recovery systems and EVR PHASE 1 Systems. All nou/es, <br />vapor recovery systems and EVR PHASEI Systems must beinstalled and maintained in accordance with <br />manufacturer instructions and Pr cedures. Attestation applies ONL Y to tested named individual <br />Attestation No, P 4548 <br />Juan Jauregui <br />VR -102- Walton Engineering Inc <br />Attended Installation Training for EVR Phase 1 by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems. This training <br />course does not eliminate the nerd to strictly adhere to manufacturer instructions and procedures when <br />mst cling and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. A#nou/e;, <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.