My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2010 - 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 3:37:10 PM
Creation date
8/5/2019 11:56:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2014
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Fal W—H* Attestation No. P 4504 <br />Matthew Jensen <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase 1 by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your insta/iatton <br />and/or maintenance Of nozzksr vapor recovery systems and EVR PHASE systems This training <br />course does not eliminate the need to sbictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. All nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named individual. <br />O P W_ Attestation No. P 4540 <br />"]OOrEN)cn"mrrr Scott Jessiman <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of Your installation <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems This training <br />course odes not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles vapor rerovey systems and EVR PHASE I Systems. All nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL V to tested named individual <br />O F=p '%/v Attestation No. P 4511 <br />Michael Koenig Jr. <br />VR -102- Walton Engineering Inc. <br />attended Installation Training for EVR Phase I by OPW', Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recovery systMts and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. All nozzles, <br />vapor recovery systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONLY to tested named individual. <br />O Attestation No. P 4537 <br />Mike Krull <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase 1 by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not creole a warranty orguaranty by OPW of your mstallation <br />and/or maintenance of nozz'es, vapor recovery systerrts and EVR PHASE I system. This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />Installing and maintaining nozzles; vapor recovery system and EVR PHASE I System. All nozzles, <br />vapor recovery system and EVR PHASE I System must be installed and maintained in accordance with <br />manufacturer insVudions and procedures. Attestaton applies ONLY to tested named individual, <br />O P VV Attestation No. P 4538 <br />;_dIr EN)coww,rr Larry L. LeDuff <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this trairung course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzes, vapor rem very systems and EVR PHASE I systems. This training <br />course does not eliminate the need to strictly adhere to manufacturer Instructions and procedures when <br />installing and maintaining nozzles, vapor recovery systems and EVR PHASE I Systems. Alt nozzles <br />vapor recovery systems and EVR PHASEI Systems must be installed and maintained in accordance with <br />manufacturer instructions and procedures. Attestation applies ONL Y to tested named mdividual. <br />O P VV' Attestation No. P 4545 <br />Robert S. Mackinnon <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase 1 by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPWof your inatallafion <br />and/or maintenance of nozzles, vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer intim-Pons and procedures when <br />vaporvaporirand maintaining nozzles, vapor --ery systems and EVR PHASE Systems. A#nozzles, <br />recovery il <br />systems and EVR PHASE I Systems must be installed and maintained in accordance with <br />manufacturer instructions and pnxedures. Attestation applies OX Y to tested named individual <br />O P Attestation No. P 4506 <br />Byron Melendez <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/or maintenance of nozzles, vapor recnverysystems and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles vapor recovery systems and EVR PHASE I Systems. A// nozzles <br />vapor recovery systems and EVR PHASE I Systerrzs must be installed and maintained in accordance with <br />manufacturer instructions and procedures Attestation applies ONL Y to tested named individual. <br />O Attestation No. P 4531 <br />, .Javier Melendrez <br />VR -102- Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPV1', Inc. <br />On: 10/4/2008 Exp Date: 10/4/2010 <br />Completion of this training course does not create a warranty or guaranty by OPW of your installation <br />and/a maintenance of nozzles, vapor recovery systems and EVR PHASE I systems This training <br />course does not eliminate the need to strictly adhere to manufacturer instructions and procedures when <br />installing and maintaining nozzles, vapor recovery system and EVR PHASE I System. All nozzles, <br />vapor recovery system and EVR PHASE I System must be installed and maintainedin accordance with <br />manufacturer instructions and procedures. Attestation applies ONLY to tested named individual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.