My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
INSTALL 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 9:08:41 PM
Creation date
8/8/2019 4:35:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. WRITTEN RESPONSE PLAN <br /> 10. If an unauthorized release occurs how will the hazardous substance be cleaned un? <br /> In the state of California, if a tank leaks and the"operator is able to cleanup the release <br /> within 8 hours after the release was detected or should reasonably been detected, and which <br /> does not escape from the secondary containment,does not increase the hazard of fire or <br /> explosion and does not cause deterioration of the secondary containment of the <br /> underground storage tank, shall be recorded on the operator's monitoring reports." Thus, in <br /> this situation,the operator should make a record of the spill and maintain this record with <br /> the gasoline files at the facility. However,this situation does not require reporting to the <br /> local agency. However, all other unauthorized releases must be reported to the local agency <br /> within 24-hours. The next action would be to evacuate the primary vessel and then the <br /> secondary vessel. The tank would then be replaced and/or repaired. Any leaking pipes <br /> will be treated in the same manner. If an unauthorized release occurs from a single-wall <br /> tank and/or piping system,the same protocol should be followed. Southland would then <br /> begin any assessment and/or cleanup activities directed by the local agency <br /> 11. List the proposed methods and equipment to be used for removing and properly- <br /> disposing of any hazardous substances. Include the location and availability of the <br /> required equipment if not permanently on-site and an equipment maintenance <br /> schedule for the equipment located on site. <br /> This Facility has absorbent material(kitty litter)on site to be used for very small spills. The <br /> absorbent material is maintained on a weekly basis and replenished as needed by the local <br /> wholesaler. Once used,this absorbent material is collected by a contractor and disposed <br /> as oily waste. If a larger spill occurs,the store operator will contact the Fire Department <br /> (911)and Southland's Dispatch I maintenance number at(800) 828-0711. The <br /> maintenance department will contact the local authorized service contractor(Banks& Co.) <br /> to collect,remove and properly dispose of the hazardous substance, San Joaquin County <br /> Environmental Health Division will also be notified, Fluor Daniel GTI, Southland's <br /> environmental consultant for the greater Los Angeles Area and Northern California Area, <br /> may also be notified. Fluor Daniel GTI will then proceed to perform whatever tasks <br /> necessary, such as a site assessment in accordance with SA/M manual guidelines. <br /> 12. List the name(s) and title(s) of the person(s) responsible for authorizing any work <br /> necessary under the response plan. <br /> The environmental coordinator for the Southland Corporation, Western Region, is Bob <br /> DeNinno. All necessary work and coordination with contractors will be authorized by his <br /> office. Fluor Daniel GTI may also be contacted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.