My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
23577
>
2900 - Site Mitigation Program
>
PR0522619
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2019 4:28:15 AM
Creation date
8/16/2019 11:56:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522619
PE
2950
FACILITY_ID
FA0015410
FACILITY_NAME
CHARLIE SPATAFORE PROPERTY
STREET_NUMBER
23577
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
Zip
953049600
APN
20908026
CURRENT_STATUS
01
SITE_LOCATION
23577 MOUNTAIN HOUSE PKWY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 KLEIN FELDER <br /> ATTACHMENT A <br /> SCOPE OF WORK <br /> Workplan <br /> Limited Soil and Groundwater Assessment <br /> Petroleum Pipeline Spill <br /> 23577 Mountainhouse Parkway <br /> Mountainhouse, California <br /> INTRODUCTION <br /> Kleinfelder is pleased to present this workplan to Charlie Spatafore, This Workplan was <br /> developed based upon our current understanding of site conditions and correspondence with Mr. <br /> Lee Hedgepeth, Esq. of Curtis and Arata (legal council for Mr. Kagehiro Ranch, Inc. and Allied <br /> Insurance), Mr. Jim Brake of Geocon Consultants Inc. (Environmental Consultant for Curtis and <br /> Arata), Mr. Robert Shultz of Cambria Environmental (Environmental Consultant for Chevron <br /> Pipeline Company) and Mr. Michael Clevenger of Pegasus MH Ventures I (Land Developer) and <br /> is a preliminary understanding of the above referenced parties desires. <br /> Kleinfelder is committed to providing quality service to its clients, commensurate with their <br /> wants, needs and desired level of risk. If a portion of this workplan does not meet the needs of <br /> the client, or if those needs have changed, Kleinfelder will consider appropriate modifications, <br /> subject to the standards of care to which we adhere as professionals. Modifications such as <br /> changes in scope, methodology, scheduling, and contract terms may result in changes to the risks <br /> assumed by the client as well as adjustments to our fees. <br /> BACKGROUND <br /> Kleinfelder conducted a Phase I Environmental Assessment (File No. 21073.P01) dated <br /> November 12, 2002. During the Phase I ESA an interview was conducted with Mr: Larry <br /> Whitehead of Chevron. According to Mr. Whitehead, "a product pipeline runs through the <br /> southwestern portion of the site. To the best of his knowledge, the pipeline is an 18-inch crude <br /> oil pipeline. Mr. Whitehead stated "that there were no reported incidents involving ruptures or <br /> leakage for the pipeline." Mr. Whitehead also stated that there are two Pacific Gas and Electric <br /> (PG&E) natural gas pipelines trending through the site." The subject site consists of agricultural <br /> farm property. <br /> Kleinfelder's understands a petroleum pipeline ruptured on December 6, 2003 releasing an <br /> estimated 750 barrels of crude oil to site soil (approximately 31,500 gallons) from an 18-inch- <br /> diameter Chevron pipeline that carries crude oil from .oil fields near Bakersfield to refineries in <br /> the Bay Area. Chevron has estimated that approximately 400 barrels were recovered (16,800 <br /> gallons) and that approximately 350 barrels still remain in onsite soil at the site (14,700 gallons). <br /> Based upon a visual surveying of surface contamination, conducted by Kleinfelder and Siegfried <br /> Engineering, Inc. the area of impacted soil has been estimated to encompass approximately 2.2 <br /> acres, extending north, east, west, and south of the pipeline location. Based upon aerial photos <br /> taken of the rupture, it appears the largest amount of oil settled to the east and northeast of the <br /> rupture following the crop lines and surface topography. <br /> 02001PROP.ENV/ST04P1 18/DH:ss Page 1 of 8 <br /> Copyright 2004,Kleinfelder,Inc. March 22,2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.