Laserfiche WebLink
I" KLEIN F E L 0 E R <br /> PROJECT SCHEDULE <br /> The proposed scope of work would be performed in accordance with the following approximate <br /> schedule. <br /> .Approximate Task <br /> Timeline ; <br /> Week 0-1 Formal workplan authorization provided by the coup health department <br /> Week 1-2 Permitting <br /> Week 2-3 Field Work <br /> Week 3-5 Chemical Analysis' <br /> Week 5 -7 Report Preparation <br /> Week 7 Report submitted to the Client <br /> t Kleinfelder has no control over the time required by a regulatory agency to review and approve a work plan and <br /> permit applications or to supply information from their files for review. <br /> 2 This work will be done by a subcontractor. Kleinfelder selects reputable subcontractors,but, does not have full <br /> control over the time required by said companies. <br /> CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This workplan and the attached cost estimate are based on the following assumptions and <br /> responsibilities: <br /> • The client will assist Kleinfelder in obtaining,access to the site and owner authorization <br /> for the proposed sampling. <br /> • Adequate work space and access will be provided. Kleinfelder will attempt to advance <br /> soil push probes and collect samples at the proposed locations. If the drilling equipment <br /> cannot be positioned or if refusal occurs, alternative drilling locations or sampling <br /> methods should be investigated. <br /> • Soil generated during the sampling will be left onsite within the contaminated footprint <br /> area. The borings will be backfilled using grout or a bentonite-type slurry. <br /> • Soil and water generated during the drilling and sampling will be the responsibility of the <br /> client. Soil cuttings and decontamination rinsewater will be left on site. Sampling and <br /> analysis of the contained soil and water may be necessary prior to disposal. Disposal or <br /> remediation options for the soil and water can be assessed once analytical results have <br /> been received. Kleinfelder is prepared to assist the client and to remediate or dispose of <br /> stockpiled soil and water, if requested. <br /> • This workplan is based on the presumption that the client will clearly mark utilities and <br /> will provide any and all available survey maps or other data to determine the location of <br /> existing structures, underground utilities and services. The client should be aware that <br /> penetrating the site's surface is inherently risky. It is impossible to determine with <br /> certainty the precise location of all structures, which may be buried in the ground. <br /> Kleinfelder's fee is not.adequate to compensate for both the performance of the services <br /> and the assumption of risk of damage to such structures. Disruption of utilities or <br /> damage to underground structures will be the responsibility of Curtis and the client. <br /> Services rendered by Kleinfelder to repair them will be billed at cost. Underground <br /> 02001PROP.ENV/ST04PI18/DH:ss Page 6 of 8 <br /> Copyright 2004,Kleinfelder,Inc. March 22,2004 <br />