My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
3230
>
3500 - Local Oversight Program
>
PR0544759
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 10:38:16 AM
Creation date
8/19/2019 10:06:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544759
PE
3528
FACILITY_ID
FA0004058
FACILITY_NAME
VANCO*
STREET_NUMBER
3230
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11708017
CURRENT_STATUS
02
SITE_LOCATION
3230 N WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 September 2007 <br /> AGE-NC Project No. 97-0300 <br /> Page 3 of 6 <br /> Laboratory reports for soil vapor analyses, testing methods, laboratory quality assurance/quality <br /> control (QA/QC)reports, and sample chain of custody documentation will be presented in a report <br /> with findings and recommendations. <br /> 2.3. CPT DRILLING AND GRAB GROUND WATER SAMPLE COLLECTION <br /> AGE proposes to drill three CPT soil borings at the southwest section of the site to define the lateral <br /> and vertical extent of 1,2-DCA-impacted ground water. Proposed CPT soil boring locations are <br /> illustrated in Figure 2. <br /> Based on 1,2-DCA-impact encountered during previous investigation at the site,AGE proposes CPT <br /> soil borings in the following locations: <br /> • (P-16) Approximately 30 to 40 feet southwest of well MW-4; <br /> • (P-17) Approximately 25 to 35 feetves of well MW-5R; and <br /> • (P-18) Approximately 50 to 60 feet south of well MW-5R(presuming access). <br /> The CPT borings shall be advanced to depths of approximately 60 to 70 feet bsg (same depth as <br /> screen intervals from wells MW-4 and MW-5R) utilizing a 25-ton truck-mounted CPT drill rig <br /> equipped with 2-inch diameter hollow-stem rods; however, total depths of borings may vary in <br /> response to hydrogeologic conditions. <br /> Grab ground water samples will be collected in intervals of porous and permeable material. Selected <br /> ground water samples will be analyzed by a State of California Department of Health Services <br /> (DHS)-certified laboratory for the following constituents: <br /> • 1,2-dichloroethane (1,2-DCA)by EPA Method 8260 Modified. <br /> Laboratory reports for ground water analysis,testing methods, laboratory quality assurance/quality <br /> control(QA/QC)reports, and sample chain of custody documentation will be presented in a report <br /> with findings and recommendations. <br /> r <br /> 2.4. REPORT PREPARATION <br /> Following the completion of the proposed scope of work, a report will be prepared presenting the <br /> findings. The report will include a description of work performed and the results of the soil-vapor <br /> f <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.