Laserfiche WebLink
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br />Facility Waterloo Food Mart Facility 4315 E. Waterloo, Stockton Inspection Oct 4, 2012 <br />Name: Address: Date: <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />This is a Routine and Monitoring Certification inspection. The following are Class II Repeat violations: <br />#104, 204, 404, 405, and the following is a Minor -Notice to Comply: #201, 403 <br />104. Financial responsibility documents have not been submitted to the EHD. Current financial <br />responsibility documents are required to be submitted annually. Complete and submit a copy of the <br />financial responsibility documents. A copy of the current financial repsonsibility documenta has been <br />provided to EHD during this inspection. Violation was corrected on site. <br />201. Volume and type of brine added in February, March, April, and July were not documented. The <br />volume , location, and type of brine added to the secondary containment shall be documented as a part <br />of your record maintenance, and to evaluate if the loss of brine indicates a compromise to the secondary <br />containment system. Immediately begin documenting the location, volume, and type of brine when <br />adding to the secondary containment. <br />204. The designated operator failed to check and note the L12: Dispenser #3/4 pan fuel alarm on <br />February 28, 2012 in the March 23, 2012 -designated operator monthly inspection report. During the <br />monthly inspection, the designated operator shall check that all required testing and maintenance for the <br />UST system have been completed and document the dates they were done. Ensure that designated <br />operators performing monthly inspections at this facility are including all of the required information on <br />the reports. <br />403. About 12 oz of brine had to be added in 91 octane fill annular reservoir for the sensor to come out <br />of alarm after testing, and unknown volume of brine was added in Dispenser #1 /2 and 3/4 brine <br />reservoirs in the months of March/April/July, and February/March 2012, respectively due to fuel alarms, <br />indicating a leak in the secondary containment. Secondary containment shall be impervious to the liquid <br />and vapor of the substance contained and constructed to prevent structural weakening as a result of <br />contact with any hazardous substances released from the primary containment. Immediately contact a <br />properly licensed, trained, and certified contractor to make repairs to the UST system under permit and <br />inspection of the EHD. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />VIOLATIONS <br /># <br />C1 <br />I C2 <br />M <br />I Code S..tlon <br />HSC = CA Health and Safe Code; CFR = Code of Federal Regulations <br />C1 = Class 1 violation: C2 = Class 2 violation. M = Minor violation <br />Non -Pressurized Piping (continued) <br />702 <br />CCR 2643(e) <br />Biennial tightness test of gravity piping not performed (pre -January 1, 1984) (M1) <br />703 <br />CCR 2643(d) <br />Triennial line test for conventional suction piping not performed (pre -January 1, 1984) (M1) <br />Other Violations <br />999 <br />Other: <br />See attached "Continuation — Official Inspection Report" for violation(s) not listed above. <br />SUMMARY OF VIOLATIONS <br />CLASS I, CLASS II, or MINOR -Notice to Comply) <br />This is a Routine and Monitoring Certification inspection. The following are Class II Repeat violations: <br />#104, 204, 404, 405, and the following is a Minor -Notice to Comply: #201, 403 <br />104. Financial responsibility documents have not been submitted to the EHD. Current financial <br />responsibility documents are required to be submitted annually. Complete and submit a copy of the <br />financial responsibility documents. A copy of the current financial repsonsibility documenta has been <br />provided to EHD during this inspection. Violation was corrected on site. <br />201. Volume and type of brine added in February, March, April, and July were not documented. The <br />volume , location, and type of brine added to the secondary containment shall be documented as a part <br />of your record maintenance, and to evaluate if the loss of brine indicates a compromise to the secondary <br />containment system. Immediately begin documenting the location, volume, and type of brine when <br />adding to the secondary containment. <br />204. The designated operator failed to check and note the L12: Dispenser #3/4 pan fuel alarm on <br />February 28, 2012 in the March 23, 2012 -designated operator monthly inspection report. During the <br />monthly inspection, the designated operator shall check that all required testing and maintenance for the <br />UST system have been completed and document the dates they were done. Ensure that designated <br />operators performing monthly inspections at this facility are including all of the required information on <br />the reports. <br />403. About 12 oz of brine had to be added in 91 octane fill annular reservoir for the sensor to come out <br />of alarm after testing, and unknown volume of brine was added in Dispenser #1 /2 and 3/4 brine <br />reservoirs in the months of March/April/July, and February/March 2012, respectively due to fuel alarms, <br />indicating a leak in the secondary containment. Secondary containment shall be impervious to the liquid <br />and vapor of the substance contained and constructed to prevent structural weakening as a result of <br />contact with any hazardous substances released from the primary containment. Immediately contact a <br />properly licensed, trained, and certified contractor to make repairs to the UST system under permit and <br />inspection of the EHD. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />