My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2010 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 4:52:21 PM
Creation date
8/19/2019 4:16:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2013
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct 20 10 01:09p Elite IV Contactors 120946IG342 <br />p.4 <br />Multi -Sync Installation Instructions <br />rDPM <br />For Blueline Medium Fittings <br />MCMncn <br />PEThis kit provides the Multi -Sync Repair for applications where the pipe is coming this the <br />4cVA[U.M nAi sump wall straight or at an angle. <br />WARNING. Prepare all surfaces to be bonded prior to completing installation steps below. <br />failure to follow each step will void warranty & may result in premature failure of penetration fitting. <br />MSZ SLM-xx <br />Page 1 This Kit applies for repairing- Blueline Medium Fittincs <br />General Instructions for: CLEANING: Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry <br />cloth. Surfaces must be dry before applying bonder. <br />General Instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean, sand and rough up sump surfaces. Clean fitting and <br />apply DBB V between Bonding Ring & sump wall. On Poly Sumps if sump wall is un -even use DRP in place of DBB V. <br />STEP 1: Remove Old Boot <br />• Remove clamps <br />Cut away old boot <br />• Clean & sand fitting <br />If everything fits continue with <br />the install. If there is a problem <br />with the fit & function of these <br />parts, either adjust to make fit if <br />possible, or tali the factory(536 <br />, 534-396ii), for additional help <br />STEP 4: Bond Sleeve ,Cuff Ring & Insert <br />• Apply Zip Tite to split cuff ring. Use 1 of <br />the damps to hold in place while curing. <br />• Apply Zip-Tite to the split insertand use 1 <br />of the clamps to hold in place while <br />curing. <br />• Apply Zip Tite to the split sleeve and use 2 <br />clamps to hold in place while curing. <br />• Leave these clamps in place for approx 30 <br />minutes for curing before proceeding to <br />the next step <br />STEP 2: Clean all Repair Components <br />• Clean all repair components with DBC <br />prior to installation <br />Split Cleaner Split <br />Cuff Sleeve <br />Ring <br />nuc.. ny..., .• <br />Eccentric Insert Split Multi -Sync <br />Insert Reducer <br />STEP 5: Install The Sleeve, Cuff Ring & Insert <br />• Apply DBB V to the outer surface of the insert <br />and fully seat Inside of cuff <br />• Apply DBB V to the inner surface of the cuff <br />ring and slide all the way onto the cuff <br />• Position the sleeve with the fill port at the top <br />• once you have the sleeve lined up correctly, <br />1. Apply a bead of Zip tite all around the <br />outer surface of the cuff ring <br />2. Slide sleeve over cuff ring & snap in place <br />(fill port at top) <br />3. Set the Clamp the around the sleeve & <br />over the cuff ring and tighten "snugly". <br />l/kLfY':'Yl <br />;TEP 3: Place & Dry Fit Cuff Ring Sleeve & Insert <br />Wrack the split cuff ring over the old fitting <br />Wrack the split insert over the pipe <br />Wrack the split sleeve over the pipe & up to the <br />bonding ring with the fill port up <br />STEP 6: Install & Bond Eccentric Insert & Multi -Sync <br />Reducer Back Together <br />• Wrack Eccentric Insert around the pipe <br />• Wrack Multi -Sync Reducer around the pipe <br />• Apply Zip Tite to split area on Eccentric Insert, press. <br />ends together & clamp <br />• Apply Zip Tite to split area on Multi -Sync Reducer, <br />press ends together & clamp <br />
The URL can be used to link to this page
Your browser does not support the video tag.