My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2010 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 4:52:21 PM
Creation date
8/19/2019 4:16:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2013
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oct 20 10 01:09p Elite TV Contactors 12094616342 <br />MSZ BLM-xx <br />Page 2 <br />Step 7: Install The Eccentric Insert & Multi -Sync Reducer <br />• Dry fit the Eccentric insert. Make sure it fits properly over the pipe & inside the <br />sleeve. <br />• Dry fit the Multi -Sync Reducer <br />• Adjust the positions so that they lineup properly with the Repair Sleeve & Pipe. <br />Note: A proper fit will not cause extra pressure or force to the sleeve and will <br />allow a longer lasting repair. <br />• Once you have the part lined up correctly <br />1. Pull back the Multi -Sync Reducer & Eccentric Insert <br />2. Apply Zip Tite bonder all around the Eccentric Insert, <br />3. Slide Eccentric into the Repair sleeve in the proper position <br />4. Apply Zip Tite bonder all around the Multi -Sync Reducer <br />5. Slide the Multi -Sync Reducer into it's proper place <br />6. Set the Clamp the around the sleeve & over the Eccentric Insert and tighten <br />"snugly". <br />7. Set clamp over reducer end on the pipe & tighten enough to create a seal <br />around the pipe. <br />p.5 <br />I 'i6l:rIrv,LSj'L <br />Repair Kit <br />It <br />Eccenvk Insert <br />Multi -Sync <br />"e' <br />- a <br />R <br />Pi eslze <br />Repair Kit <br />Cufflnsert <br />Eccenvk Insert <br />Multi -Sync <br />DBF II Fill Clam <br />50MMpipe XXX2"0 <br />MSZ BLM-2.0 <br />UIZ BLM 51x2.0 <br />UIZ 6.Ox45E <br />URZ MS45x2.0 <br />41 <br />32 <br />2"FRP XXX25 <br />MSZ BLM-2.4 <br />UIZ BLM 5.14.4 <br />UIZ6.0x45E <br />URZ MS 45x2.4 <br />39 <br />40 <br />63MM Pipe XxX25 <br />MSZ BLM-25 <br />UIZ BLM 51x25 <br />UIZ 6.Ox45E <br />URZ MS 454.5 <br />30 <br />40 <br />2" LCX XXX2.7 <br />MSZ BIM -2.7 <br />UIZ BLM 5.1x2.7 <br />UIZ6.0x4SE <br />URZ MS 4.5.2.7 <br />37 <br />44 <br />75 Mm Pipe XXX3.0 <br />MSZ BLM-3.0 <br />UIZ BLM 5.1x3.0 <br />LIZ 6.0x3.0 <br />N/A <br />34 <br />48 <br />3" FRP & 90 MM Plpe XXX3.5 <br />MSZ BLM-3.6 <br />UIZ BLM 5.1x3.6 <br />UIZ 6.00.6 <br />N/A <br />60 <br />3" FRP over 2" FRP xXX35x2.4 <br />MSZ BLM-3"6 <br />UIZ BLM 5.1x3.6 <br />UIZ 6.0x3.6 <br />N/A <br />30 <br />60 <br />3" LCX XXX3.7 IMSZBLM-3.8 <br />UIZ8LM5.1x3P <br />UIZ6.00.8 <br />N/A <br />28 <br />60 <br />Corrugated Ducting over l 112" Flex XXX4.8x20 <br />MSZ BLM-0.6x2.0 <br />UIZ BLM 5.1x2.0 <br />U¢6.Ox4ZE <br />URZ MS 4.5x2.0 <br />33 <br />32 <br />Corrugated Ducting over 11(2' Flex XXX4.13x25 <br />MSZ BLM4.6x2.S <br />UIZ BLM 5.1x25 <br />UIZ 6.Ox4.5E <br />URZ MS 4.5x2.5 <br />31 <br />40 <br />Step 9: Fill With DBF II, Insert Fill Plug <br />• Assemble DAG & DBF 11 (see instructions on DPM website). <br />• Purge 1-2 oz. <br />• Fill fitting slowly. <br />Note: Use Remote Fill option if access is limited <br />• Insert fill plug when filling is completed. <br />• Clean any spilled DBF II with DBC and dispose <br />of remaining products per local <br />Note: After 1 hour <br />the repair job may be <br />hydro -static tested <br />Remote Fill Option: <br />The following parts are available to order if you can not <br />properly position the assembled DBF II applicatorgun to <br />"fill" the repair. The Remote Fill parts provide a flexible <br />extension for the filling process. <br />RF Adapter 24" tube with male & female ends <br />RFA Tube -24 ''/2" Tubing in 24" lengths <br />RFATube YS" Tubing in 200' length roll <br />RFA TubexTube %2" Tube Coupling <br />RFA xFemale '%" Tube -Female Fill Port end <br />RFA xMale %2 " Tube -Male Fill Port end <br />RFA xPlug %2 " Tube -Male Plug for fill port <br />TOOLS REQUIRED: <br />Gloves and Static Mixer <br />5/16" Nut driver (for Band Clamps) <br />DAG Caulk Gun (for DBF 11) <br />DAGP Caulk Gun (Pneumatic version for DBF II ) <br />DAG III Caulk Gun (for DBB V) <br />PRODUCTS NEEDED: - D CTth <br />Q)C-C cC�C.. <br />`"DBC <br />Cleaner <br />DBB Ill <br />Bander <br />Each DBF II & DBB V come <br />with a Static Mixer <br />wOBF II <br />Polysulfide Liquid Fill <br />DBB V <br />Bonder (for Poly or Fiberglass <br />sumps) <br />FILL Volume.-tper repair boot <br />Volume of RBF 11 needed = <br />Volume of DBB 111 needed = <br />Volume of DBB V needed = <br />Parts in kit: <br />Bonding Ring <br />Sleeve <br />Eccentric insert <br />Multi -Sync Reducer <br />5 clamps <br />Fill Port Plug <br />Install Instructions <br />See Table above <br />UIZ MS 6.0x5.7 CR <br />USZ 6.0x6.0 <br />UIZ 6.OxSee Table <br />URZ MS 4.5xSee Table <br />3 #96, 1 #80, 1 # See Table <br />RFA xPlug <br />
The URL can be used to link to this page
Your browser does not support the video tag.