My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2010 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 4:52:21 PM
Creation date
8/19/2019 4:16:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2013
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This section discusses the installation and wiring of the hardware required to enable the TLS console to perform <br />ISD monitoring of the site's gasoline vapor recovery equipment (non -gas tanks are not monitored): <br />• Air Flow Meter <br />• Vapor Pressure Sensor <br />• Smart Sensor Interface Module (8 input and 7 input w/embedded pressure versions) <br />• NVMEM board - required <br />• 4-Rel2y Output Module <br />• Line Leak Detection <br />• Dispenser Interface Module <br />• Probe Interface Module <br />All field wiring, its type, its length, etc., used for TLS console sensors must conform to the requirements outlined in <br />the Veeder-Root TLS-3XX Site Prep manual (P/N 576013-879). <br />Air Flow Meter <br />Install one Air Flow Meter in the vapor return piping of each gasoline dispenser following the instructions in the <br />ISD Flow Meter Installation guide (P/N 577013-796). Program the meter following instructions in this manual. <br />Vapor Pressure Sensor <br />Install one Vapor Pressure Sensor in the vapor return piping of the gasoline dispenser closest to the tanks <br />following the instructions in the ISD Pressure Sensor Installation guide (P/N 577013-797). Program the meter <br />following instructions in this manual. <br />Installing TLS Console Modules - General Notes <br />TLS consoles have three bays in which interface modules can be installed; Comm bay (left door) and Power and <br />Intrinsically -Safe bays (right door). Smart Sensor modules are installed in the Intrinsically -Safe (I.S.) bay only <br />(Figure 2-2). <br />Most consoles will be shipped with modules installed as ordered. If additional features are added at a later date, <br />modules will be field installed. <br />In all cases, the position of the modules, their respective connectors and the devices wired to the <br />connectors must be recorded to prevent improper replacement during installation or service. A circuit <br />directory for Power and I.S. bay Interface Modules is adhered to the back of the right-hand door for <br />this purpose. <br />2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.