My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2010 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 4:52:21 PM
Creation date
8/19/2019 4:16:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2013
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DPM <br />Elite IV Contactors 12094616342 p.3 <br />IMulti -Sync Installa4i Instructions p <br />V L M 0 1 R For Blueline Srri; Ill Fittings <br />.PLl-' This kit provides the Multi -Sync Repair for applicat :,ns where the pipe is coming thru the <br />,. Lw vr*1. sump wall straight or at an angle. <br />WARNING: Prepare all surfaces to be bonded prior to corm eting installation steps below. <br />MSZ BLS-xx Failure to follow each step will void warranty & may rest. It r� premature failure of penetration fitting. <br />Page 1 This Kit applies for repairing:1111 Mine Small Fittings <br />7, <br />General Instructions for: CLEANING: Spray all surfaces to be bonded with DBC Cleaner and aIle -iv o air dry or wipe excess with a clean dry <br />cloth. Surfaces must be dry before applying bonder. r F, a 2 - <br />STEP <br />STEP I: Remove Old Boot <br />• Remove clamps <br />• Cut away old boot <br />• Clean & sand fitting <br />If everything fits continue <br />with the install. If there is a <br />problem with the fit & <br />function of these parts, either <br />adjust to make fit if possible, <br />or call the factory (530-534- <br />3966) for additional help <br />STEP 4: Bond Sleeve & Insert <br />• Apply Zip Tite to split cuff Insert. Use 1 of <br />the clamps to hold in place while curing. <br />• Apply Zip Tite to the split sleeve and use 2 <br />clamps to hold in place while curing. <br />• Leave these clamps in place for approx 30 <br />minutes for curing before proceeding to <br />the next step <br />STEP 2: Clean all Repair Components <br />Clean all repair components with DEC <br />prior to installation <br />Split Cleaner Split <br />Cuff Sleeve <br />Insert <br />unci: <br />Eccentric Insert Multi -Sync <br />Reducer <br />STEPS: Install The Sleeve <br />Apply DBB V to outside of cuff. <br />• Position the sleeve with the fill port at the top <br />• Once you have the sleeve lined up correctly, <br />slide onto cuff <br />Set the Clamp the around the sleeve & over the <br />cuff and tighten "snugly". <br />EP :l: dace & Dry Fit Insert & Sleeve <br />Pla_e he split cuff insert over the pipe and test fit to <br />ins d of the existing fitting cuff. <br />Place :he split sleeve over the pipe & up to the cuff with <br />th; f: fort up <br />STEP 6 Install & Bond Eccentric Insert & Multi -Sync <br />Redu !r Back Together <br />• V% r< k Eccentric Insert around the pipe <br />• Vi r; I: Multi -Sync Reducer around the pipe <br />A )F t Zip Tite to split area on Eccentric Insert, press <br />end together & clamp <br />• A;)F f Zip The to split area on Multi -Sync Reducer, <br />pie: ends together & clamp <br />
The URL can be used to link to this page
Your browser does not support the video tag.