Laserfiche WebLink
wwrtoo 12d <br />shu-fes 0,9 Oral) - <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ I NO [I <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Vent Box - Remove existing interior vent line box and electrical boots. Replace with diversified repair boots. <br />87 STP Sump - Found existing sump top hat port plugged, install new test port, test for communication. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />DPM RZ 6.7 x 3.5D <br />DPM URZ MS 2.6x1.1 <br />Western Fiberglass 3/8" Stainless Steel Test Port <br />FORVD <br />ENVIRONMEN I AL <br />NTMAf Tw nPPA T MENT <br />EH230038 (revised 12-11-15) <br />