My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 11:07:05 AM
Creation date
8/21/2019 9:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q IIS lq <br />A-Oe—vtci mt <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES [ ] NO[] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDCs, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />Remove dispensers <br />Saw cut & break out concrete at island UDCs <br />Pioina - take soil sample <br />Set 4 new Fiberglass UDCs - Install pipe entry fittings <br />Plumb Fiberglass product & vapor piping into 4 -UDC <br />Pressure test lines with EHD present <br />Make final plumbing <br />Precision line test each line product line with ERD present <br />Investigating repairs to be made to the 87 STP sump & to the transition sump. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />See attached equipment schedule <br />Transition sump parts to be used: to be determined <br />87 STP sump parts to be used: to be determined <br />112018 <br />ENVIRONMENTAL <br />HEALTH DEPARTMENT <br />EH230038 (revised 12-11-15) <br />
The URL can be used to link to this page
Your browser does not support the video tag.