My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2017 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 11:07:05 AM
Creation date
8/21/2019 9:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MSZ BLS-xx <br />Page 2 <br />Step 7: Install The Eccentric Insert & Multi -Sync Reducer <br />• Dry fit the Eccentric insert. Make sure it fits properly over the pipe & inside the <br />sleeve. <br />• Dry fit the Multi -Sync Reducer <br />• Adjust the positions so that they lineup properly with the Repair Sleeve & Pipe. <br />Note: A proper fit will not cause extra pressure or force to the sleeve and will <br />allow a longer lasting repair. <br />• Once you have the part lined up correctly <br />1. Pull back the Multi -Sync Reducer & Eccentric Insert <br />2. Apply Zip Tite bonder all around the Eccentric Insert, <br />3. Slide Eccentric into the Repair sleeve in the proper position <br />4. Apply Zip Tite bonder all around the Multi -Sync Reducer <br />5. Slide the Multi -Sync Reducer into it's proper place <br />6. Set the Clamp the around the sleeve & over the Eccentric Insert and tighten <br />"snugly". <br />7. Set clamp over reducer end on the pipe & tighten enough to create a seal <br />around the pipe. <br />Pipe Size <br />Repair Kit <br />Cuff Insert <br />Eccentric/insert Multi -S nc <br />lam <br />3/4" Rigid Conduit <br />MSZ BLS -1.1 <br />UIZ BLS 3.1x1.1 <br />UIZ 3.5x2.6E URZ MS 2.6x1.1 2 <br />16 <br />1" Rigid Conduit <br />MSZ BLS -1.4 <br />UIZ BLS 3.1x1.4 <br />UIZ 3.5x2.6E URZ MS 2.6x1.4 <br />20 <br />1" Flex Pipe <br />MSZ BLS -1.6 <br />UIZ BLS 3.1x1.6 <br />UIZ 3.54.6 N/A <br />24 <br />Step 9: Fill With DBF R, Insert Fill Plug <br />• Assemble DAG & DBF II (see Instructions on DPM website). <br />• Purge i-2 oz . <br />• Fill fitting slowly. <br />Note: Use Remote Fill option if access is limited <br />• Insert fill plug when filling is completed. <br />Clean any spilled DBF II with DBC and dispose <br />of remaining products per local requirements. <br />Note: After 1. hour <br />the repair job may be <br />hydro -static tested <br />Remote Fill Option: <br />The following parts are available to order if you cannot <br />properly position the assembled DBF If applicator gun to <br />"fill"the repair. The Remote Fill parts provide a flexible <br />extension for the filling process. <br />RF Adapter 24" tube with male & female ends <br />RFATube-24 Y:" Tubing in 24" lengths <br />RFATube %" Tubing in 200' length roll <br />RFATubexTube '/" Tube Coupling <br />RFA xFemale Yz" Tube -Female Fill Portend <br />RFA xMale Y=" Tube -Male Fill Port end <br />RFA xPlug A" Tube -Mate Plug for fill port <br />MAY S 12018 <br />ENViROItlMEN IAL <br />Adjust theposition ofthe Eccentric Insert & Multi - <br />Sync Reducer -by turning them around the opening <br />and.pipe until they are lined up such that there is <br />littie ar no -stress applied to the sleeve opening. <br />M� <br />TOOLS REQUIRED: <br />Gloves and Static Mixer <br />5/16" Nut driver (for Band Clamps) <br />DAG Caulk Gun (for DBF II) <br />DAGPCaulk Gun (Pneumatic version for DBF 11) <br />DAG III Caulk Gun (for DBB V) <br />PRODUCTS NEEDED: <br />DBC Cleaner <br />DBB III Bonder IEach DBF II & DBB V come <br />DBF II Polysulfide Liquid FIII I with a Static Mixer <br />DBBV Bonder (for Poly or Fiberglass sumps) <br />FILL Volume: (per repair boot) <br />VolumeofDBFII needed = 9.5 oz <br />Volume of DBB III needed = <br />Volume of DBB V needed = <br />Parts in kit: <br />Cuff Insert <br />Sleeve <br />Eccentric I nse rt <br />Multi -Sync Reducer <br />5 clamps <br />Fill Port Plug <br />Install Instructions <br />UIZ BLS 3.1x5ee Table <br />USZ 3.5x3.5 <br />UIZ 3.5xSee Table <br />URZ MS 2.6xSeeTable <br />2 #44,1 #40, 2 #See Table <br />RFA xPlug <br />
The URL can be used to link to this page
Your browser does not support the video tag.