My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006465
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:52:07 PM
Creation date
8/21/2019 2:51:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006465
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the pilot test will be terminated. At the start up of the test, <br /> influent samples will be obtained from monitor wells P1 , P3 and EX <br /> and an effluent sample well be obtained from the exhaust of the <br /> blower and analyzed for total Petroleum Hydrocarbons (TPH) as <br /> gasoline and diesel along with Benzene, Toluene, Ethylbenzene and <br /> Xylenes (BTEX) using DHS headspace method with FID chromatograph <br /> Western Geo-Engineers (WEGE) . Once breakthrough is indicated by <br /> PID readings, influent samples will be obtained from the vapor <br /> extraction wells, the influent to the blower and the effluent from <br /> the charcoal tub scrubs and anlayzed for TPH and BTEX by the WEGE <br /> lab. Also an effluent sample will be obtained from the charcoal <br /> tub scrub exhaust prior to shutting the system off and <br /> disconnecting it from the wells ( for analysis by Chemtech <br /> Laboratories ) . This sample will be analyzed using EPA modified <br /> x 8015 and 602 for TPH and BTEX respectively. Throughout the test <br /> vacuum readings will be obtained from the ground water monitoring <br /> wells, to help establish the radius of influence of the vapor <br /> extraction system. <br /> This source test will help evaluate the amount of fuel range <br /> hydrocarbons available and the suppliemental fuel needed to <br /> achieve incineration using the Hirtz Incenerator for emissions <br /> control during ground water and soil remediation for this site, <br /> see Figures 4A manifold for vapor extraction system and 4B <br /> schemtaic for vapor extraction system. <br /> • Start up date for Pilot Test January 8 , 1991 <br /> Monitoring-hand held PID Alternate Days <br /> Duration (maximum) 1 week or breakthrough <br /> If you have any questions, please call (916) 662-4541 . <br /> Sincerely yours , <br /> George L. Converse <br /> Project Geologist <br /> cc: Mrs . Diane Hinson, San Joaquin County Health <br /> Mr. Jorge De Guzman, San Joaquin County Air Quality <br />
The URL can be used to link to this page
Your browser does not support the video tag.