My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006465
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006465
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:52:07 PM
Creation date
8/21/2019 2:51:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006465
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 17 , 1991 <br /> Mr. John Margowski <br /> Environmental Director <br /> Wickland Properties <br /> 1765 Challenge Way <br /> Sacramento, CA 95815 <br /> (916 ) 921-1100 <br /> RE: Source Test for vapor extraction, former Regal Station 603 <br /> (EXXON) , 6425 Pacific Avenue, Stockton, California. <br /> Dear Mr. Margowski: <br /> INTRODUCTION <br /> This letter documents the results of the source test for vapor <br /> extraction into activated charcoal at the above mentioned site. <br /> PILOT TEST <br /> Gasoline range hydrocarbons are known to exist beneath the <br /> undergound storage tanks area. The tank excavation was <br /> overexcavated to the 26 foot depth. On December 27-280 1990 , <br /> monitor well MW10 was manifolded to the treatment area. On <br /> January 3 , 1991 , activated charcoal in two 85 gallon tub scrubs <br /> were delivered to the site. The blower was installed on January <br /> 7 , 1991 , and a few days later, the test was begun. The test was <br /> conducted for three and a half days (January 11-January 15, 1910 ) . <br /> Break through was noted from a sample obtained on January 14 and <br /> analyzed on January 15 , 1991 . At this time the system was <br /> sampled, shut down, and disconnected. <br /> TEST PROCEDURES <br /> Vapor extraction well MW10 was connected to a vacuum system ( 1HIP <br /> Rotron Blower ) that exhausted into two 85 gallon activated <br /> charcoal tub scrubs . Sample ports were located at excavation <br /> wells EX1 and EX2 and monitor wells MW1, MW2, MW3 , MW4, MW6 , and <br /> MW9 for obtaining vacuum/pressure and vapor readings during the <br /> test. Also sample ports were located at the intake of the blower, <br /> the exhaust of the blower , and the exhaust of the charcoal. The <br /> exhaust from the tub scrubs was checked daily for breakthrough <br /> using a hand held photoionizing detector (PID) that has been <br /> calibrated to 50 ppm i.sobutylene in air. Breakthrough was assumed <br />
The URL can be used to link to this page
Your browser does not support the video tag.