Laserfiche WebLink
Monitoring System Certification <br /> F. In-Tank Cauging / SIR Equipment: ® Check this box iftank gauging is used only fir inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> I his section must he completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entre and termination, including testing for ground faults' <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup') <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ NO Were all probes reinstalled properly.? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed'' <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if L.I.Ds are not installed. <br /> Complete the following checklist: <br /> ® yes ❑ No* For equipment start-up or annual equipment certification. was a leak simulated to verify I.LD performance" <br /> ❑ N.A Whec•k all that applrt Simulated leak rate: ® 3 g.p.h.. [10.1 u.p.h : [10.2 g..p.h. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements`' <br /> ® Yes ❑ No* \k as the testing,apparatus properly calibrated`' <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak' <br /> ® NSA <br /> ® Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the L.t_.D detects a leak? <br /> ❑ N,A <br /> ® Yes ❑ No* For electronic LL.Ds, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N-A or disconnected" <br /> ® Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N:A or fails a test? <br /> Q Yes ❑ No* For electronic LLDs. have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed" <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: - -.-- --- ------ ----- ---- — <br /> P:q;e 3 of 3 <br />