Laserfiche WebLink
06/05/2009 FRI 15: 54 FAX 2094683433 SJC EHD 0001 <br /> ********************* <br /> *** FAX TX REPORT *** <br /> ********************* <br /> TRANSMISSION OK <br /> JOB NO. 2595 <br /> DESTINATION ADDRESS 919163731172 <br /> PSWD/SUBADDRESS <br /> DESTINATION ID Walton Engineering Inc <br /> ST. TIME 06/05 15: 52 <br /> USAGE T 02' 49 <br /> PGS. 5 <br /> RESULT OK <br /> San Joaquin County DIRECTOR <br /> Environmental Health Department Donna Heran,REHS <br /> p ASSISTANT DIRECTOR <br /> 600 East Main Street Laurie Cotulla,REHS <br /> o: 'k { Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> _— Mike Huggins,REHS,RDI <br /> Margaret Lagorio,REHS <br /> cq�iFOR��P Website: www.sjgov.org/ehd Robert McClellon,REHS <br /> Phone: (209) 468-3420 Jeff Carruesco,REHS,RDI <br /> Fax: (209) 464-0138 Kasey Foley,REHS <br /> June 5,2009 <br /> Dulcinea Webb Sent via Fax and Mail <br /> Walton Engineering <br /> P.O.Box 1025 <br /> West Sacramento,CA 95691 <br /> Fax: (916)373-1172 <br /> Subject: Waterloo Shell,4315 E Waterloo Road,Stockton,CA(SR0057395) <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to repair/replace the 87 tank STP sump and under dispenser <br /> containment(UDC)3/4. This permit is only approved to determine what repairs need to be made. <br /> Do not make any repairs until the following conditions are met: <br /> Conditions of approval: <br /> 1. Contact the local fire department,local planning or building department and the San <br /> Joaquin Valley Air Pollution Control District for any applicable permits. <br /> 2. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department(EHD)for approval prior to commencing work.All new addenda supercede <br /> the previous ones. <br /> 3. Send an updated scope of work to the EHD with the parts needed for the repair <br /> before replacing UST system parts. Include cut sheets and third party testing <br /> listings for each part. An amended approval letter will be sent after the updated <br /> scope of work is received and reviewed. <br /> 4. If concrete is being broken near the UST,pipeline and tank secondary containment <br /> testing must be performed in accordance with the manufacturer's guidelines. Testing <br /> must be done after returning the facility to operating condition. Results must be received <br /> by the EHD within seven days of returning the facility to operating condition. <br /> 5. A"Certification of Installation/Modification"form shall be submitted by the owner or <br /> the owners'agent[pursuant to(CCR)2635(d)] before this upgrade will be considered <br /> complete by EHD. <br /> 11 All .11_1__1_J __ <br />