Laserfiche WebLink
San Joaquin County DIRECTOR <br /> P <br /> Environmental Health Department Donna Heran, REHS <br /> ASSISTANT DIRECTOR <br /> 2 <br /> !--976V— G Laurie Cotulla,REHS <br /> y� 600 East Main Street <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> • �- Mike Huggins,REHS,RDI <br /> • '!' Margaret Lagorio, REHS <br /> c9�iFOR°'�P Website: www.sjgov.org/ehd Robert McClellon, REHS <br /> Phone: (209)468-3420 Jeff Carruesco,REHS, RDI <br /> Fax: (209)464-0138 Kasey Foley, REHS <br /> June 5, 2009 <br /> Dulcinea Webb Sent via Fax and Mail <br /> Walton Engineering <br /> P.O. Box 1025 <br /> West Sacramento, CA 95691 <br /> Fax: (916) 373-1172 <br /> Subject: Waterloo Shell,4315 E Waterloo Road, Stockton, CA(SR0057395) <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to repair/replace the 87 tank STP sump and under dispenser <br /> containment(UDC)3/4. This permit is only approved to determine what repairs need to be made. <br /> Do not make any repairs until the following conditions are met: <br /> Conditions of approval: <br /> 1. Contact the local fire department, local planning or building department and the San <br /> Joaquin Valley Air Pollution Control District for any applicable permits. <br /> 2. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department (EHD) for approval prior to commencing work. All new addenda supercede <br /> the previous ones. <br /> 3. Send an updated scope of work to the EHD with the parts needed for the repair <br /> before replacing UST system parts. Include cut sheets and third party testing <br /> listings for each part. An amended approval letter will be sent after the updated <br /> scope of work is received and reviewed. <br /> 4. If concrete is being broken near the UST,pipeline and tank secondary containment <br /> testing must be performed in accordance with the manufacturer's guidelines. Testing <br /> must be done after returning the facility to operating condition. Results must be received <br /> by the EHD within seven days of returning the facility to operating condition. <br /> 5. A"Certification of Installation/Modification" form shall be submitted by the owner or <br /> the owners'agent [pursuant to (CCR)2635(d)] before this upgrade will be considered <br /> complete by EHD. <br /> 6. All components must be certified by an independent testing organization and labeled as <br /> required by the organization. (UL,ULC,ANSI,API, ASTM, etc. See California Code of <br /> Regulations(CCR),Title 23 Chapter 16 Table B for complete list). The component must <br /> bear the appropriate mark as required by the independent testing organization. <br /> 7. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br /> a. One of several permissible valid, current contractor's licenses issued by the <br /> Contractors State License Board(may be issued to the installation company),and <br /> Page 1 of 2 <br />