My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006468
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 3:56:46 PM
Creation date
8/21/2019 2:54:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006468
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG 603 UPDATE-9 9/14/92 <br /> n <br /> r <br /> 3 . 2 VAPOR RECOVERY: <br /> 51� VAPOR RECOVERY SYSTEM AND MONITORING <br /> 3 <br /> As stated in Update Status Report #5 , monitoring wells MW1 , MW2 , <br /> MW3 , MW10 and the excavation 6 inch (EX-411 ) have been individually <br /> manifolded to a vapor extraction system with individual valved <br /> orifices for flow control sampling and vacuum and flow <br /> t measurements from the individual wells . MW2 and MW3 are <br /> manifolded together with 2" tubing Tled at the wells , but can be <br /> ' individually tested by placing a packer below the extraction T of <br /> the well to seal that well from the vacuum system. The individual <br /> wells are fitted with a PVC "T" head with an air tight cap, for <br /> ,f well access . The "T" lateral ( 211 ) 1s fitted with a 1/4" pipe to <br /> �, � i� tubing fitting for obtaining vacuum/pressure and temperature <br /> lilt readings . Wells MW2 , and EX-4" are fitted with a pipe to hose 2" <br /> i�f fitting placed between the "T" and the 2" PVC flex hose that goes <br /> 1%f from the well to their individual condensate drop outs that hook <br /> j .j <br /> 11 <br /> into the extraction manifold. The 3" SCH 40 PVC lateral from MW3 <br /> 'T ' is also fitted with a 2" pipe to hose fitting where it enters the <br /> „ ,� ! traffic box near MW2 and is T'ed to the 2" tubing from MW2 at that <br /> point. MW1 is fitted with a 2" PVC Y to allow access to the well <br /> I � off the straight leg of the Y and vapor recovery off of the angled <br /> , leg of the Y. The vacuum recovery piping from this point rises 7 <br /> feet into the air prior to an 90 degree elbow connecting 2" PVC <br /> ; pipe at a slight incline towards the eastern fence of the <br /> Y � compound, 8 feet above the surface. At this point the PVC pipe <br /> ; drops into the condensate drop out tank for MW1 , prior to the <br /> ' vacuum extraction manifold. MW10 is manifolded to the treatment <br /> compound via SCH 40 PVC pipe underground west towards the store . <br /> Once the pipe reaches the store it connects into a condensate drop <br /> ?h out tank (Approximately 5 gallon capacity) prior to heading over <br /> the roof of the store with 2" galvanized pipe. The condensate <br /> tank 1s below ground xn a concrete lined traffic box. The <br /> condensate collected in this tank is removed weekly via an air <br /> tight valve attached to the top of the air tight lid of the tank. <br /> } �� I Once the pipe reaches the roof of the store, it 90 degree elbows <br /> into SCH 40 UV protected PVC pipe and heads across the roof <br /> € towards the treatment compound where it 90 degree elbows down the <br /> i wall into a second condensate drop out tank prior to the manifold. <br /> At the manifold the individual wells' condensate tanks are <br /> connected to their own 2" PVC riser ( 36" in height ) with an <br /> � I orifice plate and a gate valve at the top of the riser . <br /> vacuum/pressure ports are located on either side of the orifice <br /> f plate. Each orifice (well ) has its own manometer (calibrated in <br /> millimeters (mm) oil ) which are hooked to the ports for continuous <br /> measurement of flow from a particular well , or in the case of MW2 <br /> and MW3 , combination of wells . All the extraction wells are <br /> manifolded together above the gate valve to a 4 inch orifice riser <br /> PAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.