My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006469
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:00:51 PM
Creation date
8/21/2019 2:55:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006469
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG 603 UPDATE-8 7/17/92 <br /> • <br /> pulling and pushing the syringe plunger several times filling and <br /> depleting the syringe of that particular wells vapor stream Then <br /> the syringe is filled, the sample valve closed and forceps are <br /> used to clamp onto the soft polytubing to create an air tight seal <br /> for the syringe before removing the syringe from the sample port. <br /> Once the 60 cc syringe is removed with the forceps clamped <br /> polytubing attached, the plunger is pushed into the syringe to <br /> create pressure within the syringe and released to allow the <br /> vapors that have been captured to reach equilibrium A small <br /> dedicated needle attached to a dedicated 1 cc suringe is then <br /> inserted into the 60 cc syringe via the soft tubing for obtaining <br /> the sample to be injected into the PIA-GC Again the lcc syringe <br /> is purged numerous times prior to filling it with the sample All <br /> but 0 5 cc of the sample is ejected into the air prior to <br /> injecting the remaining 0.5 cc syringe sample into the GC-PID (the <br /> calibrant injection is 0.5 cc) Once the chromatogram has been <br /> recorded an instrument blank is run prior to the next sample The <br /> instrument blank will indicate if residual peaks are being carried <br /> onto the next analysis. <br /> While the GC-PID analysis is running for a particular sample (15 <br /> • minutes per sample run) , vacuum influent readings are obtained <br /> from the wells by attaching a manometer calibrated in mm water to <br /> sample ports at the well heads. These readings show the mm water <br /> Pressure or vacuum that is being created at each well. <br /> Occasionally the 1OS50 PID-GC is not available for field <br /> determination of the influent and effluent streams, tedlar bag <br /> samples are then obtained and brought back to the WEGE portable <br /> laboratory for analysis using a FID-GC <br /> C 3 VAPOR RECOVERY OPERATIONS AND RESULTS <br /> As has been stated above, soil contamination exists from beneath <br /> the tank excavation to the top of the ground water <br /> Overexcavation during the intial tank removal, removed <br /> contaminated soil to the 25 foot depth. Prior to replacement of <br /> the new double contained fiberglass tanks and dispensing system, 4 <br /> inch and 6 inch SCH 40 PVC 0.02 inch slotted pipes were placed <br /> vertically at the north corner and west corner of the excavation <br /> respectively and manifolded via underground to the treatment <br /> compound with SCH 40 2 inch and 4 inch PVC pipe. These pipes <br /> along with monitor wells MW1, MW2, MW3 and MW10 are being used for <br /> vapor extraction - soil and ground water remediation <br /> On October 10, 1991 the vapor extraction system operated for 6 <br /> hours, to check the auto shut downs and percent destruction of the <br /> REMOX unit, utilizing monitor wells MW1, MW10, and the excavation <br /> • wells. The system was restarted on October 17, 1991 for the <br /> PAGE 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.