My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006490
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
ARCHIVED REPORTS XR0006490
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 4:26:36 PM
Creation date
8/21/2019 2:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006490
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REG 603 UPDATE-6 2/21/92 <br /> test >16 MPN/100ml. All other wells wells tested below detection <br /> limits of 2 . 2 MDL/100ml . All wells (MW-2, MW-3 , MW-4, MW-5 , MW-7 <br /> and MW-8 ) tested below the detection limits of 2. 2 MDL/100ml from <br /> the January, 1992 sampling. <br /> B. SOIL: <br /> As has been shown in the "Update Status Report, February 23 , 1990" <br /> soil contaminated with gasoline range hydrocarbons exists beneath <br /> the underground storage tank excavation from the 25 foot depth to <br /> top of ground water and at the 40 foot depth to top of ground <br /> water around monitor well MW10 . The capillary fringe area ( 50 <br /> foot depth) shows the spread of contaminant out to monitor wells <br /> MW1, MW2 and MW3, see Figure 6B. <br /> C. VAPOR: <br /> VAPOR RECOVERY SYSTEM AND MONITORING <br /> As stated in Update Status Report #5, monitoring wells MWl, MW2, <br />• MW3, MW10 and the excavation 6 inch (EX-411) have been manifolded <br /> to a vapor extraction system with individuated valved orifices for <br /> flow control sampling and vacuum and flow measurements from the <br /> individual wells. MW2 and MW3 are manifolded together with 2" <br /> tubing Tled at the wells, but can be individually tested by <br /> placing a packer below the extraction T of the well to seal that <br /> well from the vacuum system, see Figure 7 . The individual wells <br /> are fitted with a PVC "T" heads with a air tight cap, for well <br /> access. The "T" lateral (211 ) is fitted with a 1/4" pipe to tubing <br /> fatting for obtaining vacuum/pressure and temperature readings. <br /> Wells MW2, and EX-4" are fitted with a pipe to hose 211 fitting <br /> placed between the "T" and the 2" PVC flex hose that goes from the <br /> well to their individual condensate drop outs that hook into the <br /> extraction manifold. The 3" SCH 40 PVC lateral from MW3 as also <br /> fitted with a 211 pipe to hose fitting where at enters the traffic <br /> box near MW2 and is T' ed to the 2" tubing from MW2 at that point. <br /> MW1 as fitted with a 211 PVC Y to allow access to the well off the <br /> straight leg of the Y and vapor recovery off of the angled leg of <br /> -Wk— V R$,— rr».-- r•� —Troyer r�i int r�.-r �rr.m }}�Z C r� i "+- r1 ceC 7 fGG� <br /> 4. J;— j . 1LiG YS3V 4L64LK iG Y—. .y t.It./l lly it V449 I kA-- Ll-1114 LiJr,.J • i +�'� <br /> into the air prior to an 90 degree elbow connecting 211 PVC pipe at <br /> a slight incline towards the eastern fence of the compound, 8 feet <br /> above the surface. At this point the PVC pipe drops into the <br /> condensate drop out tank for MWI, prior to the vacuum extraction <br /> manifold. MW10 is manifolded to the treatment compound via SCH 40 <br /> PVC pipe underground west towards the store. Once the pipe <br /> reaches the store it connects into a condensate drop out tank <br /> (Approximately 5 gallon capacity) prior to heading over the roof <br /> of the store with 2" galvanized pipe. The condensate tank is <br /> below ground in a concrete lined traffic box. The condensate <br /> PAGE 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.