My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
INSTALL 1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 4:40:15 PM
Creation date
8/23/2019 3:54:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPORTANT 1.0 TANK SET-UP INFORMATION, <br /> _ <br /> Please read this safety information before WARRANTY AND CHECK-OUT <br /> FORM <br /> beginning set-up. <br /> This product has been installed and will operate in the Warranty and check-out forms were sent to you when <br /> highly combustible environment of a gasoline storage your X76 ETM was shipped. The white copy of these <br /> tank. It is essential that you carefully read and follow forms must be completed and returned to API/Ronan <br /> the warnings and instructions in this manual to protect to validate the warranty. Part 1 of the Warranty and <br /> yourself and others from serious injury, explosion or Check-out Form includes the Tank Set-up Informa- <br /> electrical shock. tion Form. See sample on page 18. <br /> For safety reasons we have taken particular care in Before starting, make sure the following material and <br /> the design of this product to limit power in the wiring information is available. <br /> to the fuel tanks and to keep that wiring physically A. Warranty and Check-out Forms. <br /> separated from other wiring. It is your responsibility to B. Site Preparation and Installation Manual. <br /> maintain the effectiveness of these safety features by <br /> starting up and operating this product in accordance C. Tank Specifications - including tank material, <br /> with the following instructions and warnings. Failure volume, diameter, manufacturer's height to <br /> to do so could create danger to life and property and volume conversion chart. <br /> result in voiding all warranties connected with this D. Tank Tilt Information. <br /> product. Fuel height readings at fill riser and probe riser, and <br /> Warnings their distances from the center tank hole should have <br /> been taken at the time of probe installation and <br /> Do not apply power to the X76 ETM System until its recorded in the site preparation manual. Check Sec- <br /> installation has been checked and found to be in ac- tion 4.0 Component Installation, starting on page 5, <br /> cordance with the instructions outlined in the following for tank tilt information and enter it on set-up informa- <br /> warnings and conditions: as well as, the National tion sheet. <br /> Electrical Code: Federal, State and Local Codes, and If tank tilt was indicated by a difference in fuel read- <br /> other applicable safety codes. ings, enter "YES" on the set-up chart. The X76 ETM <br /> 1. Conduits or wiring troughs from Probes to Control- will calculate the tank tilt information you input from <br /> ler must not contain additional wires. No other the set-up information sheet. <br /> wires are permitted in the same enclosure as Note: Refer to page 9 for Product Label code num- <br /> probe wires. Probe wires must be contained in a bers. <br /> separate, dedicated rigid conduit. <br /> 2. The conduit run from probe to controller must not <br /> exceed 2,500 feet. See installation diagram for the <br /> X76 ETM's correct wire requirements. 2,0 PRODUCT DESCRIPTION <br /> 3. All conduits must enter the controller through pre- <br /> punched conduit holes. Ronan's Electronic Tank Monitoring Systems assure <br /> 4. Do not install the controller in a volatile, combus- you of accurate and dependabe performance no mat- <br /> tible or explosive atmosphere. ter what your application—fuel inventory, intank leak <br /> 5. Installation and use of this product must comply detection, product line leak detection, secondary con- <br /> with the National Electrical Code; Federal State tainment monitoring or vadose and ground water well <br /> and Local Codes: and any other applicable safety monitoring. The heart of the Series X76 ETM system <br /> codes. is an unique memory chip which will not lose program <br /> 6. For information on line pressure, vapor monitoring information or report even when power is shut off. <br /> and other X76 ETM related devices, refer to the Combining an on-board printer, a membrane keypad <br /> X76 LVC Instructions and Operating Manual. and an LCD display, the X76 ETM is a system easy <br /> to operate and simple to understand. <br /> In addition to simple operation, the X76 Electronic <br /> Tank Monitoring System provides advantages be- <br /> cause of two on-board telecommunication interfaces. <br /> This advanced technology allows you to schedule <br /> timely bulk deliveries and provides the convenience <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.