Laserfiche WebLink
NIQN LiT0KNQ l!RaMDUMS FQR>"QTJE;LE WALL PTPW.Q SYSTEMS <br /> All double wall piping is sloped downward to a sump that is attached to underground storage tax&s. In the event of a leak <br /> or pressure lass a manual in-line leak detector is activated and will reduce product flow to 2 gallons per minuta. The leaking <br /> product will be contained within the doubled wall piping and will flow downward and terminate into a sump, The sump area <br /> is monitored +vith a liquid sensing probe that will activate a visual and audible alarm system. <br /> If the rsystcr n goes into alarm., the station operator vrill check uaE alarm system pariel and perform a test procedure in verify <br /> that th?systcm is not rnalfitactionhng. If the system confirms a lealc the operator is to imatcdiatcly shut dos+.n the product ar;F <br /> contact the designatcd Shall rmprcse-ntative and advise him./her of than situation so that they c= fullo::'tht instructions outlined <br /> in the "sirELL LEAK RESPONSE PLAN", which is part of this HA7r1,kD0T-T5 MATERIAL MANAGEMENT PLAN. <br /> The system used at this facility is V'EEDFR ROOT TLS 350 <br /> The monitoring will be preformed on site by the authorized personnel below. <br /> PPR VENTAT1VF MAINTF.KANCE <br /> The mominnng equipment shall be inspected anal certified annually. MainlenaiicQ will be performed annually or as <br /> needed. All work performed to the monitoring system will be in accordance to the.a?mam1facrurers recommendations. <br /> !F-SPONSE PLAN <br /> If a failure occurred in the piping systems annular space. the~dealer will contact Smice Statin..Services at Soc-&87- <br /> SW9. Service Station Systems will contact Shell Maintenance to determiM the proper actions. --,b;ch rnay� include <br /> performing an integrity test or a allina a contractor to pump Cleo.product:.ut of the sumps. ahs local sgYncy will be <br /> properly nntified of the status orthe piping. All follow-up will be completed within the month theproblern xeurred. <br /> Ti AINING <br /> Tank operators are trained on the proper operations of the monitoring Nuipment per the manu6cturer's instM4--tions. <br /> RF_.,.SPQNSI$LE SHELL PERSONNFji The following personnel are responsible for performing monitoring or maintaining <br /> the equipment. <br /> NAM TI'T'LE PFYI"7NE <br /> !'�WWArn N lorby _ Dealer Day 209-931-3674 <br /> 246 20-9-369-2252 <br /> Teff i*rurib rry Project lun�iR e; Work 510-67j-�145 <br /> Home, 510 673•-073 <br /> :left'fiyram District Engineer ;York 510-671-6146 <br /> Horne 510-614--9413 <br /> Dan T, Kirk. Environmental Engineer Work 510-675-6168 <br /> Home SID-283-8573 <br /> 4 <br /> 110 HUS OCT9SLWS'' YVd CO:-ZT 26aTC/TO <br />