Laserfiche WebLink
o To r a ac at�x �F bo L w T <br /> Thr M lv Tt7 ,TNG <br /> The Underground storage tanks are monitored using <br /> system is able to detect the presence of a leak in the ars approved t°aatinuolts trwnitoring system(gee below). This <br /> Wet (liquid filled)or a Dry annular space and sub primary�well as se48ndary containtneat through the use of a <br /> log that charts the operating status of the ed liquid level'sensor. The operatpr will maintain a daily <br /> tiootlitotyh a tem. If&alarm conditions occurs, the dealer will call <br /> �4 hours.Service Station Services at 800-887-80099{24 hour}immiediatoly. Response to the alarm condition will Occur within <br /> if the alarm condition is NOT the result of an equiptmt failure, then Shell will air the <br /> iaA system'in <br /> accordance with all local and state requirements. If the alarm conditsult of an equipment re, Shell <br /> will repair the equipment as required and ensure that ion is the reit is functioning Properly <br /> MQNIT'C3RJNG SYS !rM <br /> The following continuous monitoring system is used at this facility: <br /> VEEDER ROOT TLS 35 <br /> Tho monitoring will bo preformed an site by the authorized <br /> personnel below. <br /> PR VENTATIVE M[AINTEN NGE <br /> The monitoring eq pmeat shall be inspected pzeted aaad certified annually. Maintenance will be pert <br /> needed. All work performed to the monitoring system will he in accordance to the manufacturers <br /> cturers ormed <br /> annually or as <br /> rM0R7mendation. <br /> VSU L 14tQN� IT JNQ of the tank Monitor alarm box is performed daily by the dealer or a designated emplo <br /> Pleetie sae the a[tstche[1 site man yee.for the location of all equipment and forms for k0cping monitoring recpad,g at the site. <br /> The electronic monitoring devices are maintained According to manufacturer's recommendations. <br /> The dealer will R1,%o perform inventory recoatciliation according to the procedure outlined in the Inventory reconciliation <br /> section of this plan. <br /> Training wilt be given which includes information regarding: how to self test the electronic Inonito <br /> the equipment monitors, how to tell when the alarm goes off, how to perform inventory reconciliation,reptyrzl IteCpjh <br /> requirements ar►d procedures to fOIIOW in the eve dlt of alarm activakion leak,sus rtag equipment, what <br /> f' g <br /> r suspected leak, 4r puller emergency. <br /> TRA----�� . <br /> Tank operators are trained an the proper o,peratiOns of the monitoring equipment per the manufacturer's <br /> instruct i ons. <br /> R SF .N 1 LE SN L .P S N E • The following personnel are responsible for performing monitoring or <br /> maintaining the equipment. <br /> NAM>� TITLE <br /> Willis N rh P_DU <br /> Dealer <br /> Jeff Granberry Day 209-931-3674 <br /> Project Engineer 24hr 209-369-2252 <br /> Work 514-675..6145 <br /> Jeff$yram ,Fiorate 51"73-0753 <br /> bistrict Engineer Work 51t7-G75-6146 <br /> Dan T. Kirk Envirntimeatal Engincer Home 510-674-9413 <br /> 'Work 51{T-ci75-6163 <br /> See also "Shell Leak Response Plan' Home 510-283-8573 <br /> 6OOf9t7O I1 TIaRs OsT99L90TS YVd ZOt7T WTUTO <br />