My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2023 11:49:43 AM
Creation date
8/26/2019 9:14:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1ZI ul 11:04 <br />4441fdo <br />Ll: StKVlth5 <br />SECTION 7 ♦ Resting Recommendations <br />In buried applications, it is suggested that long pipe runs YOUR SMITH PIBE <br />LASS PRODUCTS RE'PliF.ti1:N'1:' <br />be partially backfilled at various points to secure theta in OR CALL SMITH PI WRGLASS <br />PRODUCTS AT 501 -Si <br />place. All joints and connections should be left exposed M Nps <br />EXCEEDING T11 V ll f►tl <br />for inspection. pRFCCO <br />FOR THE C R <br />MENT OF THE SYS 1M, <br />OR IF YOU CONTL•MP1,A'1 I <br />SMITH FIBERGLASS PRODUCTS RECOMMENDS USING AIR OR GA <br />N SPITE OF THIS WARNIN(i. I <br />ANY VIEW SAFETY RE <br />THAT YOU DO 0WITH <br />UTIONS, PARA. 1.7,1, 13 F,1 C�itt <br />FETY 13AZ- STARTING THEION <br />AIR OR GA5B£CAUSE OF THE SAST <br />TF <br />ARDS CREATED. The light weight, flexibility, and elastici- <br />ty of fiberglass pipe create different conditions than are If testing with air c r <br />gas is required or requestcol to I <br />-ca" <br />present with steel pipe. If a failure should occur while formed, the follow <br />g testing procedures and tilt <br />testing fiberglass pipe with air or gas, the system would must be followed. <br />be subject to considerable whipping and other shock - <br />As In system here <br />is employed, adegl. <br />induced conditions due to the sudden release of stored any <br />pressure <br />energy. The violent release can cause severe personal safety precautions aiust <br />be exercised. EXERCISE 171 <br />,mE <br />injury or death to personnel in the area and can also CARE IN INSTALL rIG <br />AND TESTING P11'INt i <br />I <br />cause property damage to the pipe or other property. TEM. DO NOTA <br />ME THE RISK Or INJURY Olt <br />ERTY DAMAGE. <br />if a line is tested with air or gas, Smith Flbetglass products <br />will not be responsible for any resulting injury to person- 1. visually lnspe4 t <br />all bonded joints for proper it) <br />nel or damage to property, including the pipe. If there is and adhesive <br />a prior to pressurizing the Pill" <br />no alternative to testing with air or gas, Smith Fiberglass tem. A gap be ween <br />the adhesive bead and tht <br />Products will recommend test procedures and precautions shoulder indic ites <br />that the possibility of iolni I <br />to minimize possible hazards, but will not bear responsi- exists. Make a iy <br />necessary repairs before pre-im <br />bility fox damage or injury under any circumstances. the piping Sys R <br />m. See Paxa. 1.6.9 for potential <br />Such testing is done entirely at the risk of those in- of joint fatlur <br />volved. <br />2. Check the int i <br />rity of the joints by pzes5.uiizi,t• <br />1.7.2 Test Procedures system to 25 <br />(0.172 MPa) sand holding the <br />sure for a m <br />um of one minute, then soap <br />Installed Smith Fiberglass Products pipe systems should be to test for lea <br />tfsted prior to use to assure soundness of all joints and <br />in I <br />connections. in testing, sudden pressure s ges or "wattt 3. If there are nleaks, <br />tem to a max ILlum <br />raise the tine pressure <br />of 50 prig (0.345 MPI). A <br />hammer" must be avoided;ls iri some in noes surge or <br />hammer can produce press�i s of several times the rating hold the pres <br />a for at least one minute, antl <br />of the pipe and fittings. Locaste pressure gauge in close joints to the <br />for leaks. <br />proximity to the pressurizing equipment -not directly on <br />the piping system. Pressure gauge with the test pressure at 4. As serI4 Js <br />personal injury or death cats 1 <br />midscale is recommended. the pif <br />inspector should take precaM it, <br />his(he <br />ersonal safety and protection a <br />The normal recommended procedure is to conduct a hy- flying debris, <br />d also against the whipping; it, <br />drostatic cyclic pressure test. The piping system is subject- the pipe, wh <br />can result from the sudden r+ <br />ed to 10 pressurization cycles at 1% times the anticipated stored ener <br />Goggles should be wnnl tit qtr <br />or design operating pressure. Note: For low pressure ap- against flyin <br />ebris. <br />plications, it is best to use the pressure rating of the pipe <br />as the design operating pressure, i.e. test at 19 times the S. Avoid <br />xsorial contact With the piping; <br />cyclic rating. The test pressure should not exceed 1Y, © while t <br />is pressurized during testing, t'.\ <br />times the maximum rated operating pressure for the the ac L <br />at checking of the joints for k -it <br />lowest rated element in the system. Pressure is then Absolutely n <br />one should be in the trench wl <br />kept on the system for 1-8 hours while the line is inspect- pipe is being irliftially <br />pressurized For leak to+st'. <br />ed fox leaks. Notify all sit <br />rsonnel before begfrining Ih- <br />proceduie. <br />1.7.3 Air Test Procedures and Safety Precautions(t) <br />6. Do rt <br />straddle the pipe Diming tc;tin-.: <br />TESTING WITH AIR OR GAS 15 EXTREMELY DAN- A check rg <br />© <br />the piping system for possihl, <br />GEROUS AND SHOULD NOT BE DONE. CONSULT <br />(t) ib not use these testing procedures and safety pr cAUtMs for smith Section 5 of this mar�s�I for mating procrdi+nes fin .+ +:e•n i irr <br />fiberglass Nodu0s secondary contalnmeot piping systems. Sec Part Two, piping systems. ' i! <br />18 .0 _ � _ Installation fns: <br />
The URL can be used to link to this page
Your browser does not support the video tag.