b: 1'2!J1 yowl 11:00 44(41 IJ:) L�, SCISV1k CM <br />Thursday, March 29, 2001 10:03 AM www,EFE3tore5.Com (209) 941-4558 <br />4, ItEOUIRED INSPECT]ONS <br />Note: The contractor's PHS-EHD approved plans of the UST installation shall <br />site and must be shown to the PIIS-FHD inspector upon request. In add <br />fire department shall approve the UST installation prior to commenceme <br />All appointments for ittapectiona must be Marjo at leIIct 48 lours in advance <br />minimum required inspections: <br />ur. Before installation, the tank shall be tested for tightness at the instatlatio, <br />with the mauttfacturer's written guidelines. If there are no guidelines, tl <br />secondary containment shall be tested for tightness with air pressure bev <br />per square inch. In lieu of a pressure test, a vacuum expressed in inches <br />interstitial apace of the secondary containment, is acceptable_ The press <br />interstitial space) shall be maintained for a minimum of 30 minutes. <br />All new primary piping and secondary containment systems shall be tes <br />Installation in accordance with rnanufacture is guidelines. Primary pre <br />hydrostatically tested at 150 percent of design operating premure or pet <br />percent of design operating pleasure. If the calculated test pressure for <br />less than 40 psi, 40 psi shall be used as the test pressure. The pressure <br />a minimum of 30 minutes and all joints shall be soap tested. If there at <br />guidelines, secondary currtainment systems shalt be tested using an app; <br />in an industry, code or engineering standard. <br />c. All lines other than pressure piping sbalt be pressure te4tcd at not lees tl <br />more than 5 p.& -i- for a minimum of 30 minutes and soap tested while u <br />d. Containrpent sumps shall pass a 24 hour hydrostatic leak test. <br />C. The spill container shall be shown to be capable of draining liquid back <br />L The monitoring system fihall pass a functional test. The functional test <br />activation of the alarm via all monitoring probes/sensors. <br />g. Final inspection and approval to operate will be granted after the above <br />satisfied and a hard copy of the tank integrity test [as required by Sectio <br />submitted to the inspector at the She. <br />If you need further assistance, or wish to schedule alt appointment to d <br />field inspection, please contact our Underground Storage Task Staff at <br />EH23 008 (REVISED 9-14-00) <br />r-- <br />retainod at the job <br />on, the applicable <br />of work. <br />Below are the <br />rte in accordance <br />primary and <br />en 3 and 5 pounds <br />f mercury in the <br />e (or vacuum in the <br />for tightness after <br />ized piping shall be <br />atically at 110 <br />Ssurizod piping is <br />at be maintained for <br />ii manufacturer's <br />we method specified <br />3 p.s.i. and not <br />r pressure. <br />the fuel tanks. <br />consist of the <br />:qurrements are <br />2635 (a) (5)J is <br />the plan review of <br />468-3427. <br />