Laserfiche WebLink
4-11-2001 12:08PM FROA, P. 2 <br />Date April 11.2001 <br />EMERGENCY RESPONSE PLAN <br />LNDERGROLND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br />conditions of the operating permit. The permit holder must notifv_$an Joaquin County, OES and San Joaquin County Environmental <br />Health within 30 days of any changes to the monitoring procedures, unless nquired to obtain approval before making the change. <br />Required by Sections 26321d) and 2641(h) CCR. <br />Facility Name_ Waterloo Shell <br />Faciliry Address 4315 Waterloo Road. Stockton <br />If an unauthorized release occurs, how will the hazardous substance be cleaned up? Note: <br />If released hazardous substances reach the environment, increase the fire or explosion <br />hazard, are not cleaned up from the secondary containment within 8 hours, or <br />deteriorate the secondary containment, then _San Joaquin County. OES and San Joaquin <br />County Environmental Health must be notified within 24 hours. For small spills the on <br />site personnel will use absorbent material to clean up the released material. In the event of a <br />larger Will, the dealer will call 9-1-1 (if necessarX). his/her Equilon Representative and the <br />Equilon Engineer to assist in the emergency. If the Veeder Root panel goes in to alarm <br />V eeder Root will notify Equilon. <br />Describe the proposed methods and equipment to be used for removing and properly <br />disposing of any hazardous substances. <br />Spent absorbent will be placed into an approved container and disposed of in accordannce <br />with all Local. State, and Federal laws and regulations The dealer is responsible for <br />coordinating the disposal of all used absorbent._ Ally additional equil2ment will be provided <br />be the reponding contractor. <br />3. Describe the location and availability of the required cleanup equipment in item 2 above. <br />Absorbent is maintained on site and restocked as needed by the site personnel. -Any <br />additional equi2ment is maintained by the contractor. and available on an as needed basis. <br />4. Describe the maintenance schedule for the cleanup equipment. <br />Absorbent is inspected weekly and reordered as needed. Anx equipment provided by the <br />responding contractor is the responsibility of that cont=or. <br />List the name(s) and title(s) of the person(s) responsible for authorizing any work necessary <br />under the response plan. <br />William Norbv/ Station Dealer <br />Bruce Marubashi / Equilon SH&E Coordinator <br />Brett Hovland / Equilon District Engineer <br />LC Services / Maintenance Contractor <br />I \HAZMATtShe1t1,6o501M0N(TGR ' sim hlerge.doc <br />