Laserfiche WebLink
PRODUCT PIPING REPLACEMENT <br />Shell Facility <br />4315 E. Waterloo Rd. <br />Stockton, CA <br />WORK PLAN <br />March 23,2001 <br />Replace all primary and secondary piping for 87 and 92 products. Replace all sump penetration <br />boots. New pipe will match existing. ( A.0. Smith) <br />REMEDY <br />To ensure compliance with future secondary piping pressure testing requirement, replacing the <br />existing piping is appropriate as this time. <br />The plan is to begin piping replacement on March 26, 2001. <br />