Laserfiche WebLink
UST SYSTEM DRAWING INFORMATION <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8 <br />9. <br />10 <br />am <br />IC. Inns .unrwa <br />TANK #L ` �' T r" <br />C__ <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />`, <br />Plans drawn to scale in non -erasable print. <br /># <br /># <br />Plot plan to show location of tanks and all associated piping. <br />✓ <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />N�LA <br />Tank cross-sectional diagram. <br />Detail of tank, associated piping, excavation and cover. <br />✓ <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />✓ <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(1°) and <br />secondary (2°) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />_ <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />IC. Inns .unrwa <br />TANK #L ` �' T r" <br />C__ <br /># <br /># <br /># <br /># <br /># <br />CAPACITY <br />MANUFACTURER <br />COMPOSITION <br />MODEL <br />PRODUCT <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO BE INSTALLED r S i l "j e. <br />_ A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation, <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)] <br />_ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washer, <br />etc.). <br />_ (2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />