Laserfiche WebLink
D. Alternate construction for new underground storage tanks con — ning motor vehicles fuel [Section 26331. <br />(1) Monitoring and response plan [Section 26341. <br />(2) Underground storage tank composed of.... <br />(a) Fiberglass reinforced plastic. <br />(b) Cathodically protected steel. <br />(c) Steel clad with fiberglass reinforced plastic. <br />(d) Other material that complies with section 2631 and 2632. <br />_ (3) Floor of leak interception and detection system constructed on a firm base and sloped to <br />collection sump (use of membrane liners comply with section 2631 (d) (6) requirements.) <br />_ (4) Access casings installed in the collection sump of the secondary containment system with <br />backfill in the interstitial space. The access casing shall meet all of the following: <br />Designed and installed to allow the liquid to flow into the casing. <br />_ Sized to allow removal of collected liquid and able to withstand all anticipated applied <br />stresses. <br />Constructed of material that will not be structurally weakened. <br />Screened along entire vertical zone of permeable material. <br />Capable of preventing leakage of any hazardous substance from the casing. <br />Extend to the ground surface and covered with a locked waterproof cap. <br />Capable of meeting S.J. Co. PHS-EHD Well Standards. <br />Leak interception and detection system shall prevent the leaked hazardous substance from <br />entering ground water. <br />14. INTERSTITIAL SPACE MONITORING J <br />A. Visual monitoring [Section 2632 (c) (1)7 <br />(a) Exterior surface and floor beneath tank monitored by direct viewing <br />(b) Daily visual inspections <br />(c) Liquid level in tank to be recorded at time of inspection <br />_ (d) If liquid observed around or beneath primary tank, owner will determine if an unauthorized releas <br />has occurred. <br />B. Mechanical or electronic monitoring [Section 2632 (c) (2)7 <br />(a) Continuous monitoring system connected to an audible and visual alarm system. <br />Monitoring equipment to be installed <br />Manufacturer- <br />Model Number: <br />Sensor Type: Vapor _ Liquid _ Both. <br />Sensor/Panel specifications. <br />_ Location(s) for sensors: <br />Tank Piping• <br />Dispenser• <br />C. Monitoring and response plan submitted [Section 2632 (d) (1) & (2)]. <br />15. Any special accessories, fittings, coatings, or linings not inherent within the initial design of the 1° tank or <br />double-wall UST. [Section 2631 (b)] <br />A. Approved by a nationally recognized independent testing organization. <br />8. Demonstration of integrity with the primary and/or secondary containment. <br />