Laserfiche WebLink
PRODUCT PIPING REPLACEMENT <br />Shell Facility <br />4315 E. Waterloo Rd. <br />Stockton, CA <br />WORK PLAN <br />April 2, 2001 <br />Replace all primary and secondary piping for 87 and 92 products. Replace piping penetration boots at <br />turbine sumps and dispenser pans. New pipe will match existing ( A.O. Smith ). Equipment specifications <br />are listed on site plan or manufactures literature attached. <br />REMEDY <br />To ensure compliance with future secondary piping pressure testing requirement, replacing the existing <br />piping is appropriate at this time. <br />The plan is to begin piping replacement on April 3, 2001, <br />CLARIFICATIONS <br />1. The following items will be replaces in conjunction with this piping replacement: <br />Primary and Secondary Piping, Flex Fittings, Piping Penetration Boots. <br />2. The following existing items will be utilized in conjunction with this piping replacement: <br />Tanks, Turbines, Swift Check Valves, PLLD Transducers, Ball Valves, Electrical penetration <br />boots, Vapor Recovery Piping (except as needed to replace dispenser pan penetration boots), <br />Dispenser Pan Sensors. <br />