My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
306
>
1600 - Food Program
>
PR0544163
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2019 2:32:34 PM
Creation date
8/30/2019 3:25:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544163
PE
1624
FACILITY_ID
FA0025108
FACILITY_NAME
FRESH 2 GO BAR GRILL & LOUNGE
STREET_NUMBER
306
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
306 E MAIN ST STE 203
P_LOCATION
01
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX E <br /> HOT WATER DEMANDS <br /> FIXTURES NO. OF X GPH = TOTAL GPH <br /> UNITS <br /> 3 x 1*2 _ <br /> a 5� x - <br /> 1 O X <br /> X <br /> C-1 1A x ?� _ <br /> 1 x 140 _ <br /> X = <br /> X = <br /> x = <br /> X = <br /> X = <br /> X = <br /> I. Calculating the BTU (British Thermal Units) for kitchen gas water heater: <br /> GHP x 60 degrees rise x 11* = BTU <br /> *8.33 lbs./gal. of water = 11.1 (rounded off= 11) <br /> 0.75 (thermal efficiency of gas) <br /> The gas hot water heater with at least a rating of BTU <br /> II. Calculating the KW (kilowatt) requirement for kitchen electric water heater: <br /> Total GPH = GPH = KW* <br /> gal/KWH gal/KWH <br /> *KW= GPH x °RISE x 8.33 <br /> .98 x 3412 BTU <br /> KW <br /> Please make the necessary changes or alterations, as indicated above, for the minimum supply of hot water for the food <br /> establishment. The recovery rate of the properly sized water heater must meet the peak demands of the total GPH. <br /> EHD 16-01 22 PLAN CHECK GUIDE <br /> 7/5/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.