My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
3500 - Local Oversight Program
>
PR0544792
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 11:50:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544792
PE
3528
FACILITY_ID
FA0004849
FACILITY_NAME
BILLS BAIT & BEACON GAS
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
515 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr � Y1AL h•• a, # + <br /> -16 <br /> Geo(ogicafTechnics Inc. <br /> 2F01�jrw.r'1tMd ?,lydmnnunrnl,SperleQtrs ' � <br /> M#dajo,CA 9SlS1 <br /> November 15,1989 <br /> Ms. Diane Hinson,R.S. N O V " 1989 <br /> San Joaquin County Heath Department <br /> 1601 East Hazelton Avenue EMV "ti - JAL HEALTH <br /> i Stockton,California 95201 <br /> RE: SOIL REMEDIATION/NEW UST INSTALLATION <br /> BILL STEWART'S PROPERTY(BILL'S BAIT&BEACON GAS) <br /> TRACY,CAL O�RNIA <br /> t,��y, I <br /> r <br /> Dear Ms.Hinson: 'I <br /> N <br /> This letter is to inform you of our work schedule for beginning the soil remediation and new <br /> , � ! <br /> underground tank installation at Bill Stewart's property located at 515 11th Street in Tracy, <br /> California. Tanks and supplies have been ordered by SEMCO for the tank installation and r <br /> should arrive the first of December. Our tentative starting date for thisk i '� <br /> 1989. work 11 December 10 <br /> t <br /> The soil remediation work plan will begin first by enlarging the existing excavation and <br /> stockpiling this material on the back part of the property. Soil samples will then be collected r4f, <br />- from the side walls. Ground water may be pumped from the excavation and containerized until ' 3 , <br /> treated.and disposed in the city waste water treatment system (a permit is being obtained). Tt <br /> x <br /> The excavation will then be backfilled and compacted with soil from the new•f�nk excavation. <br /> This soil will be tested before being placed in the old excavation. <br /> The stockpiled.soil will be composite sampled and analyzed for petroleum hydrocarbons. The <br /> results of this testing will help determine the soil treatment method used at this site, <br /> If you have anyquestions regarding this work schedule or work plan,please contact me. "' , <br /> Sincerely <br /> I <br /> _ Raynold I. Kablanow TI, Ph.D. <br /> Geologist/Gcochemist $i3 <br /> k>f <br /> 1 <br /> RIK:rsb <br /> cc: Mr.Ben Curran/Mr. Al Costa/SEMCO-Mr. Dave McCain/CRW <br /> - QCB-Mr. Torn Peltier <br /> ` ►. ; <br /> �.r <br />
The URL can be used to link to this page
Your browser does not support the video tag.