My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
3500 - Local Oversight Program
>
PR0544792
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 11:50:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544792
PE
3528
FACILITY_ID
FA0004849
FACILITY_NAME
BILLS BAIT & BEACON GAS
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
515 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t-4 <br /> NOV 1 7 1989 <br /> Geofogical Technics Inc. =NV E R <br /> 2601 Pjvrr!Xead PE.R M PF 7 S LER 1-1: <br /> En r4ron men ta(Specia[W5 <br /> %odesto,CA 95351 <br /> (2 09)538-7805 <br /> November 15,1989 <br /> Ms. Diane Hinson,R.S. <br /> San Joaquin County Heath Department <br /> 1601 East Hazelton Avenue <br /> Stockton,California 95201 <br /> RE: SOIL REMEDIATION/NEW UST INSTALLATION <br /> BILL STEWART'S PROPERTY(BILL'S BAIT&BEACON GAS) <br /> 51511TH STREET <br /> TRACY,CALIFORNIA <br /> Dear Ms.Hinson: <br /> This letter is to inform you of our work schedule for beginning the soil remediation and new <br /> underground tank installation at Bill Stewart's property located at 515 11th Street in Tracy, <br /> California. Tanks and supplies have been ordered by SEMCO for the tank installation and <br /> should arrive the first of December. Our tentative starting date for this work is 11 December <br /> 1989. <br /> The soil remediation work plan will begin first by enlarging the existing excavation and <br /> stockpiling this material on the back part of the property. Soil samples will then be collected <br /> from the side walls. Ground water may be pumped from the excavation and containerized until <br /> treated and disposed in the city waste water treatment system (a permit is being obtained). <br /> The excavation will then be backfilled and compacted with soil from the new tank excavation. <br /> This soil will be tested before being placed in the old excavation. <br /> T -- <br /> The storkn;'-d -;' Will be 0 comn--ite,--pled and sin�lyzed for netro!eum hydrocarb E. Th-. <br /> -- - --,I- I- , r, 0-1 <br /> results of this testing will help determine the soil treatment method used at this site. <br /> If you have any questions regarding this work schedule or work plan,please contact me. <br /> Sincerely <br /> C!1)A <br /> Raynold I. Kablanow 11, Ph.D. <br /> Geologist/Geochemist <br /> RIK:rsb <br /> cc: Mr.Ben Curran/Mr. Al Costa/SEMCO-Mr. Dave McCain/CRWQCB-Mr. Tom Peltier <br />
The URL can be used to link to this page
Your browser does not support the video tag.