Laserfiche WebLink
WEG1E:TABLE 4 <br /> DESERT PETROLEUM SERVICE..STATION 787 <br /> 950 11TH STREET <br /> TRACY, CALIFORNIA <br /> NON CERTIFIED WATER ANALYSIS BY WEGE PORTABLE LABORATORY OF WESTERN GEO-ENGINEERS <br /> SAMPLE TYPE DATE DATE TVO BENZENE Resistiv&y C! {PPM) FLUOR ODER VAPOR VAPOR <br /> LOCATION I OBTAINED RUN FID m k PPB AT 75 F TITRATION COLOR GASOLINE DATE TVO PPM <br /> MONITOR WATER 5.07-88 5-09.88 250.0 4639 3.14 1150 tr=oyalddm STRONG 5-06-88 1500 ' <br /> WELL#1 WATER 5-10-88 5-15-88 20 215 6.03 400 ND MODERATE 5.10-88 2000 <br /> WATER 5-13-88 5-15-88 1.5 4.8 5.75 410 ND TRACE 5-13-88 1.550 <br /> WATER 641-88 6-03-88 .03 22.0 628 350 ND TPACE 5.20-88 +2000 <br /> WATER 6-01-88 6-03-86 ND 5.6 825 400 ND NO 5-23-88 1800 <br /> PUMPED 5-27-88 .. <br /> 6-01-88 <br /> I - <br /> MONITOR WATER 5-07-88 5-09.88 ND 15.3 7.10 400 ND mod"o Pvc 5-10-88 6 , <br /> WELL N2 WATER 5-10-88 5-15-88 1.0 2.8 6.79' 350 ND NO 5-13-BB 13.5 S <br /> WATER 5-13-88 5-15-86 1.5 NO 6.05 380 ND ND 5-20-88 4 <br /> WATER Gr01-68 6-03-E8 NO NO 6.91 400 ND NO 5-23-88 12 R <br /> 5-27-88 38.4 <br /> 6-01.88 4.6 <br /> 60688 2.7 <br /> MONITOR WATER 5-07-88 5-09-88 1.0 45 5.39 500 Ire fnt yal skim NO 5-10-88 70 <br /> WELL 03 WATER 5-10-88 5-15-88 NO NO 6.54 360 NO NO 5-13-88 43 <br /> WATER 5-13-88 5-15-88 05 NO 5.90 370 ND NO 5.20-68 20 <br /> WATER 6-01.88 6-03.88 NO 1.1 6.61 400 ND NO 5-23-o..Q 6 <br /> 5-27-88 5 <br /> 6-01-88 3.5 <br /> 6-06-88 4.6 <br /> BORING 1 WATER 5-5-88 -- -- -- 720 50o tre nt yat akin MODERATE <br /> BORING 2 WATER 5-6-83 -- -- -- 6.30 450 NfD} NO <br /> - -- 5. <br /> -1-NORTH <br /> 2 SOUTH <br /> 2.5 <br /> 3 TANK 5.13-88 NO <br /> 5-20-88 ND G <br /> TVO-TOTAL.VOLATILE ORGANICS NN NONE DETECTED METHODS <br /> mglkg-MILLIGRAMS/KILOGRAM PVC-PLASTIC ODER IN NEW WELL TVO WATER-THE HEAD SPACE ABOVE WATER SAMPLES WERE <br /> PPB-MICROGRAMS/LITTER •..+2000;NITIAL.1400 STABILIZED INJECTED INTO A FID ANALIZER CALIBRATED T010 PPM <br /> PPM PARTS PER MILLION VOUVOL •'-+2000 INITIAL,1100 STABILIZED BENZENE: - <br /> 1 NORTH-NORTHERN POOL OF •' +2000 INITIAL,530 STABILIZED BENZENE- THE HEAD SPACE ABOVE WATER SAMPLES WERE INJECTED <br /> WATER IN EXCAVATION INTO PHOTOIONIZING CHROMATOGRAPH CALIBRATED TO <br /> 2 SOUTH-SOUTHERN POOL OF LOWER DETECTION LIMITS 11 PPB BENZENE. <br /> WATER IN EXCAVATION TVO WATER..001 MG/KG VAPOR- VAPOR READINGS TAKEN WITH PHOTOVAC TIP,CALIBRATED <br /> 3 TANK -WELL COMPLETION BENZENE-0.1 PPB TO 50 PPM GASOLINE VAPOR,118"TUBING INSERTED +- T <br /> FLUID IN HOLDING TANK TVO VAPOR-1 PPM INTO WELL <br /> FLUOR-FLUORESCENCE <br /> page 35 <br /> I _ <br /> I <br />