Laserfiche WebLink
04-14-92 Turkatte 212 <br /> 0.3 Telephone conversation with <br /> responsible party regarding <br /> additional items needed for the <br /> workptan; documented. <br /> 04-16-92 Turkatte 215 0.3 Additional responsible party <br /> paperwork amended-resubmitted for <br /> review and processing. <br /> 04-30-92 Turkatte 215 0.3 Original copy of the workplan <br /> received; letter accompanying <br /> workplan reviewed and filed. <br /> 05-11-92 Turkatte 215 0.5 Additional responsible party <br /> notification letter received back <br /> from Post Office as being <br /> unclaimed; tetter resent regular <br /> mail (not certified). <br /> 07-15-92 Turkatte 215 0.3 Fax copy of a letter from the <br /> consultant regarding an extension <br /> for the submittal of the permit <br /> application received and reviewed. <br /> 07-21-92 Turkatte 215 0.2 Original copy of the above noted <br /> Letter received; filed. <br /> 08-06-92 Turkatte 215 1.0 Permit application received; a <br /> tetter authorizing consultant to <br /> sign permit application letter <br /> received from drilling contractor <br /> via fax; permit #92-2795 issued <br /> for drilling of monitoring well <br /> WWA. <br /> 08-07-92 Turkatte 215 0.4 Yesterday's activities documented <br /> In the file; copies of the permit <br /> made and mailed to consultant; <br /> consultant notified of permit <br /> issuance and of PHS/END's <br /> notification requirements. <br /> 10-01-92 Turkatte 212 0.3 File pulled to update; telephone <br /> conversation with responsible <br /> party regarding scheduling of the <br /> next phase of field work. <br /> '10-14-92 Kroll 210 2.0 Site visit during construction and <br /> grouting of monitoring well MW; <br /> travel time to and from site. <br /> 10-19-92 Turkatte 215 0.4 Copies mode of completed permit; <br /> copy of permit filed; original <br /> copy submitted for filing. <br /> 12-07-92 Turkatte 212 0.2 Telephone Colt made to responsible <br /> party-message left; documented. <br /> 12-10-92 Turkatte 212 0.3 Telephone conversation with <br /> responsible party regarding date <br /> of submittal of report; documented <br /> call. <br /> 1� <br /> 01-12-93 Turkatte 215 1.4 Review of the monitoring well <br /> installation report dated 12-19-92 <br /> began; additional responsible <br /> 2 <br />