Laserfiche WebLink
� Y <br /> Parties reviewed to ensure they <br /> fall within the recently clarified <br /> Federal definition of a <br /> responsible party-alt appeared to <br /> compty. <br /> 01-13-93 Turkatte 215 0.4 Review of the monitoring well <br /> installation report completed; <br /> chronology started for site in <br /> preparation for draft letter to <br /> responsible party regarding next <br /> phase of work for site. <br /> 01-20-93 Turkatte 215 2.5 Work on chronology continued; <br /> comprehensive review of <br /> microfiched reports to include <br /> data in chronology. <br /> 01-21-92 Turkatte 215 3.0 Chronology completed; several <br /> issues specific to site discussed <br /> with supervisor in preparation for <br /> draft letter to responsible party. <br /> 01-22-93 Turkatte 215 2.5 Letter to responsible party <br /> drafted; submitted for review. <br /> 01-29-93 Turkatte 215 0.4 Letter revised; resubmitted for <br /> review. <br /> 02-04-93 Turkatte 215 0.3 Letter finalized; submitted for <br /> final signature. <br /> 3 <br />