• Ta atics Inc. Page 2 <br /> CB Properties Well Abandonment <br /> Project No: 8.2 <br /> December 5, 1997 <br /> • Because there may have been some residual contamination still present near MW-2, the <br /> entire well was drilled out to a total depth of 16 feet bgs. The boring was then closed by <br /> pressure installing a neat cement grout via a tremie pipe from the bottom of the hole. <br /> • All of the abandoned wells were finished flush to grade with a concrete cap. <br /> This concludes the site closure work at the B.C. & D. Property site. If you have any questions <br /> please do not hesitate to call. <br /> Respectfully Submitted, <br /> GEOLOGICAL TECHVC5 INC. <br /> Michael semi <br /> Geologist <br /> Raynold 1. Kablanow II, Ph.D. <br /> RG/HG/REA <br /> cc: Mr. Steve Sasson- SJC PHS/EHD <br /> Ms. Beth Thayer- CRWQCB-CVR <br /> gAjobsVx&d wi,b"9712.doc <br />