Laserfiche WebLink
Former Discovery Chevrolet <br /> August 12, 1994 <br /> TASK 4. Report Preparation: Upon receipt of all the data, GSI will prepare a <br /> report which describes the well installation activities and presents our 3 <br /> assessment of the hydrocarbon impact at the subject site. The report <br /> will include copies of the well boring logs, analytical laboratory reports, <br /> and sample chain-of-custody documentation. T,-,, ,„ 'f 0�W j (. <br /> SL <br /> If you have questions, please call us in Rancho Cordova at (916) 631-1"314, � 0400b4i <br /> GeoStrategies, Inc. DG p/oJ. <br /> q9T%C/ �,YWPQ <br /> Stephen J. Carter * No.5577 * i <br /> Project Geologist ' tP Q <br /> R 5577 �9OFCAUF�Q�\ <br /> Gary D. Barker ' <br /> Senior Project Manager <br /> Figure 1 . Vicinity Map <br /> Figure 2. Site Plan <br /> Figure 3. Proposed Groundwater Monitoring Well Construction Detail <br /> Attachment A. GSI Field.Methods and Procedures <br /> Attachment B. Site.Safety Plan, Job #6146.701 ) <br /> f <br /> I <br /> Report No. 6146.701-1 <br /> 5 <br /> GeoStrategies Inc. <br /> �w t <br />