Laserfiche WebLink
November 15,1995 <br /> Former Discovery ChevroletExecutive Summary of Excavation Workplan <br /> Tracy,Cahfomra <br /> Transport hydrocarbon bearing soil from the site and dispose in an acceptable landfill. <br /> • Clean backfill will be imported to the site for backfilling and compacting the excavation. <br /> The excavation will be backfilled to grade so that access to the adjacent service bays is <br /> available. <br /> • Resurface the excavation the weekend following:excavation and backfilling so that the . <br /> surface is suitable for traffic the_following Monday morning. <br /> Evaluate the data collected during excavation and the results of December groundwater <br /> sampling and address where-or if addrtrona'1 monitoring wells are required for this site. <br /> This work is tentatively scheduledto be--completed on the first weekend in December and an- <br /> evaluation of the data completed by-the end of January. All work is to be performed during the <br /> hours that the service bays for the existing car dealership are closed to minimize impact to the <br /> business. <br /> Please call us at 9.16-939-2170 should you have any questions regarding this site. <br /> Sincerely, <br /> Horizon Environmental Inc. <br /> Gary . Barker <br /> Senior Project Manager <br /> cc: Ms. Michelle Nokes,Winner Ford <br /> Mir. Steve'Sasson"Sjms <br /> .2 <br />