My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002162
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
18325
>
2600 - Land Use Program
>
UP-01-09
>
SU0002162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 5:11:33 PM
Creation date
9/4/2019 9:46:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002162
PE
2626
FACILITY_NAME
UP-01-09
STREET_NUMBER
18325
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WY
City
MANTECA
Zip
95336
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
18325 S AIRPORT WY
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\401\UP-01-09\SU0002162\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' c <br /> PUBLICWORKS <br /> DEPARTMENT <br /> ENGINEERING <br /> DIVISION <br /> e o <br /> To: Ben Cantu <br /> From: Keith Conarroe = � <br /> CC: Mike Brinton, Jim Podesta <br /> Date: April 19, 2005 <br /> Re: Water Supply Evaluation for Airport Way-Yosemite Ave. <br /> Annexation <br /> This memorandum provides an. assessment of the City's ability to provide water for <br /> the Airport: Way — Yosemite Avenue Annexation. The annexation encompasses <br /> approximately 90 acres and includes approximately 92 dwelling units. The number <br /> of new connections with the annexation is below the threshold of 500 units required <br /> for a Water Supply Assessment or a Water Supply Verification. <br /> Water for the existing dwelling units is provided by onsite wells. With the annexation, <br /> the existing dwelling units would be offered the opportunity to connect to the City <br /> water system. At present only the units on Yosemite, Fishback and Wawona (43 <br /> units) are adjacent to an existing water main. The remaining units located on Airport <br /> Way (49 units) would require the installation of a water main before water service <br /> could be provided. <br /> The water supply for the annexation will be adequate with the addition of the surface <br /> water supply and currently planned wells. <br /> Water Suppiy <br /> Future water supplies for development and new connections in the City of Manteca <br /> will be provided by the South County Water Supply Project and future groundwater <br /> wells. The South County Surface Water Supply and future groundwater wells are <br /> addressed in the City of Manteca Water Supply Master Plan and the 2000 Urban <br /> E-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.