Laserfiche WebLink
pp U,fly � <br /> COUNTY OF SAN JOAOUIN <br /> ' THOMAS R.FLINN I <br /> DEPARTMENT OF PUBLIC WORKS DEPVTYDIRECTOR <br /> • ._ '.-•P• P.O.BOX 1810- 1810 E.HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> September 14, 2000 <br /> I <br /> RECIE / i <br /> MEMORANDUM <br /> SEP 2 0 2000 <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department, Community Development Dept. <br /> CONTACT PERSON: Chandler Martin <br /> FROM: Ben Neely, Engineer Il -bEM <br /> Public Services Division <br /> SUBJECT: MS-00-30 A MINOR SUBDIVISION APPLICATION TO CREATE FOUR <br /> RESIDENTIAL LOTS WITH A DENSITY BONUS FOR A REDUCTION IN <br /> LOT AREA AND LOT WIDTH LOCATED ON THE EAST SIDE OF <br /> ANTEROS AVENUE, 1,000 FEET NORTH OF WASHINGTON AVENUE. <br /> (DISTRICT 2). <br /> APPLICANT: Paul and Barbara Covey APN: 157-210-10 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. In addition, the existing San Joaquin County and City of Stockton Flood <br /> Insurance Studies, which delineate flood risks, floodplains, and floodway areas, are currently <br /> being reevaluated. The reevaluation is being conducted by the Federal Emergency <br /> f. Management Agency, Region IX, Building 105, Presidio of San Francisco, California <br /> 94129-1250, telephone (415) 923-7186. The reevaluation may delineate additional flood <br /> risks. The official flood maps are available for review at the Department of Public Works, <br /> 1810 East Hazelton Avenue, Stockton. These flood maps will be updated when the <br /> reevaluation process is completed. <br /> Anteros Avenue has an existing right-of-way width of 50 feet and a planned right-of-way <br /> width of 50 feet. Hinkley Avenue has an existing right-of-way width of 50 feet and a planned <br /> I right-of-way width of 50 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when parcels are developed. <br /> The fee is due and payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. The frontage improvements for Anteros Avenue and Hinkley Avenue shall be <br /> constructed in conformance with the standards for one-half of a fifty-foot right-of-way <br /> Local Residential Street. The construction of the frontage improvements will be <br /> deferred, upon execution by the owner of a Deferred Frontage and Roadway <br /> Improvement Agreement or a Secured Deferred Frontage and Roadway Improvement <br /> I <br /> I <br />