Laserfiche WebLink
7 <br /> d.. The frontage improvements for Arata Road shall be constructed in conformance with the <br /> standards for ane-halfof a 50-foot-wide right-of-way rural road street: (Development Title Section <br /> 9=1150.2) <br /> e. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due.and <br /> payable at the time of building permit application. The fee currently is $829.00 per 1,000 square <br /> feet of building designated as Manufacturing in the Stockton area. The fee shall be automatically. <br /> adjusted July 1 of.each year by the Engineering Construction Cost Index as published by the . <br /> Engineering News Record. (Resolution R-00-433) <br /> L The Regional Traffic Impact Fee shall be required for this development. The fee is due and <br /> payable at.the time of building permit application. The fee currently is $780.00 per 1,000 gross <br /> { square feet of building designated as Industrial. The fee is based on the current schedule. <br /> (Resolution R-06-38) <br /> g. The Water Supply Facilities Impact Mitigation Fee shall be required for this development" The fee <br /> is due and payable prior to issuance of the building permit. The fee currently is $260.00 per <br /> 1,000 gross square feet of building designated as Manufacturing. The fee shall be automatically <br /> increased on January 1 of each year through the year 2015 at the rate of 4.55 percent. A credit <br /> may be allowed if it can be verified that the existing development on this site was in operation on <br /> or after April 30, 1991. (Development Title Section 9-818.4 and Resolution R-97-5) <br /> I h. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> i <br /> i. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification" <br /> j. The applicant shall obtain a Storm Water Pollution Prevention Pian (SWPPP) permit from the <br /> State Water Resources Control Board prior to the beginning of any construction. <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall <br /> require a State NPDES construction permit. <br /> + 3. ENVIRONMENTAL_ HEALTH DEPARMENT (Staff Contact: Michael Escotto 468-3443 <br /> a. Prior to final occupancy, the applicant shall obtain discharge requirements from the California <br /> Regional Water Quality Control Board, Central Valley Region, prior to development. (Water <br /> Code, Article 5, Section 13280) <br /> b. Prior to issuance of building permits, Environmental Health requires a soil suitability/nitrate <br /> loading study, incorporating proposed staff and customer use, which indicates that the area is <br /> suitable for septic tank usage (Development Title Section 9-1105.2[d]}. A review fee of$475.00 <br /> r must be paid at the time of submittal to Environmental Health. <br /> t <br /> The sewage disposal system shall comply with the on-site sewage standards of San Joaquin <br /> County prior to approval. A percolation test that meets absorption rates of the manual of septic <br /> tank practice or the EPA Design Manual for on-site waste water treatment and disposal systems <br /> is required for each parcel. A permit fee of$95.00 per percolation hole is required. <br /> c" Prior to issuance of building permits, the existing private water wells shall be tested for the <br /> chemical Dibromochloropropane (DBCP) and nitrates. Samples are to be taken and analyzed by <br /> a State approved laboratory. (Development Title Section 9-1115.7) <br /> Conditions of Approval - 3 - PA-0700046 <br /> i <br /> L <br />