Laserfiche WebLink
Thomas M. Gau <br /> COMMENTS ON DEVELOPMENTS' <br /> SA-99-18 <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is <br /> due and payable at the time of building permit application. (The fee currently is <br /> $602 per 1,000 gross square foot of building as Manufacturing in the Manteca <br /> area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News <br /> Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-96-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:RWH:gn <br /> 0S-9C16AG1E <br /> E. Manuel Lopez, Deputy Director/Development <br /> I _ <br /> i <br /> N <br /> I <br />