Laserfiche WebLink
c. All decorative rocks, cobbles, and landscaping shall be removed from the right-of-way along the <br /> entire frontage. <br /> d. Onsite-parking stalls at the end of a row(e.g. the Phase III stall adjacent to Atkins Road) shall have <br /> the ability to navigate in and out(i.e. with a"hammerhead" or equivalent). <br /> e. The owner shall execute an "Irrevocable Offer and Agreement to Dedicate Road" to result in a <br /> twenty-five (25) foot wide right of way from the centerline of Atkins Road to the property line across <br /> the parcel's_frontage. (A fee is required for processing per Development Title Table 9-240.2 in <br /> addition to a copy of the Grant Deed and a legal description of the parcel to be offered for <br /> dedication.) The fee due will be based on the current fee schedule.) (Development Title Section 9- <br /> 1150.5) <br /> thiis develepment. The fee is due an4. <br /> payable atthetime of building peFmitaPP4iGatiGR. The fee shall be autematiGally adjusted july 1-Gf <br /> eaGh year by the F.Rg�ReeFing GGP.6tFUGti0R Gest index as published by the EngineeFiiig News <br /> f. The Traffic Impact Mitigation Fee shall be required for anv incremental traffic resulting from this <br /> application The fee is due and payable at the time of building permit application. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolution R-00-433) <br /> q-. The Regienal q !FnpaGt Fee shall be required foF this develepment. The fee is due <br /> (Reso'UtOGR R 06 38) <br /> g. The Regional Transportation Impact Fee shall be required for any incremental traffic resulting from <br /> this application The fee is due and payable at the time of building permit application. The fee will <br /> be based on the current schedule at the time of payment. (Resolution R-06-38) <br /> h. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> i. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> J. The developer shall provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from <br /> discharging onto other properties. Retention basins-shall be fenced with six (6) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention basin <br /> capacity shall be calculated by a registered civil engineer, licensed contractor or licensed architect <br /> prior to release of Building Permit. (Development Title Section 9-1135) <br /> k. The proposed project disturbs less than one (1) acre of ground and is not part of a larger plan or <br /> common development. The proposed project shall follow the practices in the County "Small Site <br /> Stor_mwater Management Plan". The site shall be designed to contain storm water runoff on site <br /> and to prevent offsite sediment transport. <br /> I . All vehicular parking related to applicant's winery shall be onsite at all times. Parking in the County <br /> right-of-way for all winery related events shall be prohibited. It is the responsibility of applicant to <br /> monitor Atkins Road to ensure compliance with this requirement. <br /> San Joaquin County PA-0900094/Bokisch <br /> Community Development Page 13 <br />