My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007861
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
PA-0800105
>
SU0007861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 11:37:03 AM
Creation date
9/4/2019 10:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007861
PE
2675
FACILITY_NAME
PA-0800105
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
APN
20106003
ENTERED_DATE
8/11/2009 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
RECEIVED_DATE
7/24/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR PA-0800105\NOP.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
687
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L, Draft Supplemental Environmental Impact Report Page IV.0-12 <br /> Forward Inc. Landfill 2014 Expansion Project <br /> As shown in the 2013 DEIR Summary of Impacts and Mitigation Measures Table,no feasible mitigation <br /> measures are available to reduce the projects contribution to cumulative noise impacts. It should be <br /> noted that sound barriers are not feasible in the semi-rural areas that would be affected by cumulative <br /> traffic increases,because the barriers would be far removed from the activity areas of sensitive <br /> im receptors and the sound barriers would generally be an unnatural barrier not only to noise but also to <br /> distant views now possible in these areas. Thus,no mitigations are available for this cumulative <br /> impact other than reducing project operations. Such a reduction would be a substantial change to the <br /> %W proposed project and therefore is addressed as a component of Alternative 2B (Reduced Size/Reduced <br /> Daily Operations Alternative) in Chapter V of the 2013 EIR. Therefore, the project's noise increment is <br /> considered to be cumulatively considerable and the cumulative traffic noise impact is considered <br /> significant and unavoidable. <br /> L. <br /> s <br /> bw <br /> r.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.