Laserfiche WebLink
.d. A�' .4 ^. V . ,� _IV r♦ _li ���� .�7, �r� a:.F q f� .i.... SII ��� \r t fY ,t_,�..1 ...a-. .1: <br /> Draft Environmental Impact Report Page I1-8 <br /> Forward Inc. Landfill Expansion <br /> of water or by presoaking. <br /> • When materials are transported offsite,all material shall be covered,or effectively <br /> wetted to limit visible dust emissions, and at least six inches of freeboard space <br /> from the top of the container shall be maintained. <br /> • All operations shall limit or expeditiously remove the accumulation of mud or dirt <br /> from adjacent public streets at the end of each workday. However,the use of <br /> blower devices is expressly forbidden, and the use of dry rotary brushes is <br /> expressly prohibited except where preceded or accompanied by sufficient <br /> wetting to limit the visible dust emissions. <br /> • Following the addition of materials to, or the removal of materials from, the <br /> surface of outdoor storage piles, said piles shall be effectively stabilized utilizing <br /> _ sufficient water or chemical stabilizer/suppressant. <br /> • Within urban areas, trackout shall be immediately removed when it extends 50 or <br /> more feet from the site and at the end of each workday. <br /> • Any site with 150 or more vehicle trips per day shall prevent carryout and <br /> trackout. <br /> Enhanced and additional control measures for construction emissions of PM10 shall be <br /> implemented where feasible. These measures include: <br /> • Limit traffic speeds on unpaved roads to 15 mph. <br /> • Install sandbags or other erosion control measures to prevent silt runoff to public <br /> roadways from sites with a slope greater than one percent. <br /> • Install wheel washers for all exiting trucks, or wash off all trucks and equipment <br /> leaving the site. <br /> • Install wind breaks at windward side(s)of construction areas. <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation, grading, and other construction activity at any <br /> one time. <br /> The applicant shall implement feasible control measures during construction to mitigate <br /> NO,,and ROG emissions from construction equipment, which may include: <br /> • Require construction equipment used at the site to be equipped with <br /> catalysts/particulate traps to reduce particulate emissions.These catalysts/traps <br />